{
  "edition": "complete-reference-08",
  "method": "Authored relationship layouts plus exact preserved operation contracts; existing Canvas reused.",
  "approval_rule": "Compilation and file existence do not approve visual quality or coverage. Render review is recorded separately.",
  "figures": [
    {
      "id": "C08-D01",
      "target": "figure-c08-d01",
      "title": "The connected journey and its optional branches",
      "file": "images/diagrams/c08-d01-whole-journey.svg",
      "original": "images/diagrams/c08-d01-whole-journey.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-JOURNEY-02",
        "C08-JOURNEY-10",
        "C08-JOURNEY-11"
      ],
      "source_ids": [
        "DST01",
        "DST02",
        "DST03",
        "DST04",
        "DST05",
        "DST06",
        "DST07",
        "IP00",
        "IP09"
      ],
      "caption": "The main creative route connects Earth, Moon, Mars, Europa, Titan and Pluto. Ceres and Io retain full optional campaigns. The diagram distinguishes a complete Solar conclusion from the separately proposed continuation.",
      "alt": "Six principal journey cards are connected in order. Ceres and Io sit in a separate optional row, with every journey returning useful knowledge, people and actual stock.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "22406e8eca7ba27812c7d6484b5676845822cc2730a89271249a6a0e815d0775",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D02",
      "target": "figure-c08-d02",
      "title": "Industry, equipment and craft capability are distinct",
      "file": "images/diagrams/c08-d02-capability-relationships.svg",
      "original": "images/diagrams/c08-d02-capability-relationships.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-JOURNEY-07",
        "C08-CRAFT-02",
        "C08-BUILD-05"
      ],
      "source_ids": [
        "IP00",
        "IP09",
        "HUL01",
        "HUL06",
        "T1-V01"
      ],
      "caption": "A selected outcome is evaluated across industrial method, personal preparation and an actual vessel configuration. Their shared validation is a whole completed duty.",
      "alt": "A goal branches into three different responsibilities, which converge on a complete supported job and future validation.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "59765839f6e73b0a29f4149cdf1bd1263ef518257eb39f894ce9fae42cc09b1a",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D03",
      "target": "figure-c08-d03",
      "title": "Observation, material, allocation and home display",
      "file": "images/diagrams/c08-d03-evidence-stock-and-home.svg",
      "original": "images/diagrams/c08-d03-evidence-stock-and-home.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-ATLAS-03",
        "C08-JOURNEY-05",
        "C08-JOURNEY-09"
      ],
      "source_ids": [
        "PM03",
        "PM04",
        "IND-M51",
        "IND-M55"
      ],
      "caption": "The same discovery has a persistent informational record and finite physical material. Production and display each retain actual custody rather than duplicating the sample.",
      "alt": "Four different records connect source knowledge, a real specimen, a committed production portion and a displayed or stored result, with interruption preserving identity.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "430e46245dad3a8ff6c28aaf03856fc8969346cbc70ac3a67d6d04a2cd61eca3",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D04",
      "target": "figure-c08-d04",
      "title": "Typed services from real source to compatible receiver",
      "file": "images/diagrams/c08-d04-typed-services.svg",
      "original": "images/diagrams/c08-d04-typed-services.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-03",
        "C08-CRAFT-03",
        "C08-JOURNEY-08"
      ],
      "source_ids": [
        "IND-M38",
        "IND-M39",
        "IND-M40",
        "IND-M45",
        "T1-V01"
      ],
      "caption": "Four explicit service paths compare the supplying source, intended receiver and custody boundary. No line establishes a universal connector or final rate.",
      "alt": "Four rows each connect a real source to its compatible receiver: electricity, breathing supply, propellant and process media. A shared control note preserves their separation.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "7287d032510b8441bbe8d38026d4b0d78b47b0472570ed53ce79346babafef79",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D05",
      "target": "figure-c08-d05",
      "title": "Generation: variable places, preserved critical relationships",
      "file": "images/diagrams/c08-d05-generation-contract.svg",
      "original": "images/diagrams/c08-d05-generation-contract.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-ATLAS-02",
        "C08-JOURNEY-04",
        "C08-BUILD-06"
      ],
      "source_ids": [
        "EAR01",
        "EAR07"
      ],
      "caption": "Arrival, observation, work and return form the critical local contract. Meaningful variation changes the player choice while retaining the complete supported loop.",
      "alt": "A four-stage critical route connects arrival to observation, a working position and an independent return. An adjoining variation contract requires seed evidence and actual clearance.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "9869ef4b44c71b60dba7c0763d5efe589fb847072b43c85057d13ee195b2e1a3",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D06",
      "target": "figure-c08-d06",
      "title": "Creative intent, implementation selection and evidence",
      "file": "images/diagrams/c08-d06-validation-and-authority.svg",
      "original": "images/diagrams/c08-d06-validation-and-authority.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-BUILD-01",
        "C08-BUILD-02",
        "C08-BUILD-04",
        "C08-REF-02"
      ],
      "source_ids": [],
      "caption": "Creative direction becomes a future implementation brief, measured behavior and user-facing acceptance evidence. Failed evidence changes the explicit assumption rather than rewriting history.",
      "alt": "Four bounded stages form an evidence loop, ending in a traceable handoff that keeps approval, implementation and verification separate.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "e29d9f623d2dd739df8cd90202c2a17d84e063d953ca27a6b4f37878476ed907",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D07",
      "target": "figure-c08-d07",
      "title": "Active work, preserved parked state and return",
      "file": "images/diagrams/c08-d07-active-and-parked.svg",
      "original": "images/diagrams/c08-d07-active-and-parked.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-ATLAS-04",
        "C08-IND-15",
        "C08-JOURNEY-06"
      ],
      "source_ids": [
        "IND-M59"
      ],
      "caption": "Managed activity preserves actual stock and partial work across departure and return. This is a specific future state contract, not a claim that all vanilla processes pause.",
      "alt": "Active work, departure, inactive parked state and return form a closed loop with explicit stock preservation at the boundary.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "bc734ab7f66007af9e6e9d2f64b92d8eb12d8ded89c09b532dd7b62e9ef33a6c",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D08",
      "target": "figure-c08-d08",
      "title": "The finite atlas and the roles of other catalogued bodies",
      "file": "images/diagrams/c08-d08-finite-atlas.svg",
      "original": "images/diagrams/c08-d08-finite-atlas.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-ATLAS-01"
      ],
      "source_ids": [
        "SYS01",
        "DST01",
        "DST02",
        "DST03",
        "DST04",
        "DST05",
        "DST06",
        "DST07"
      ],
      "caption": "The map separates the included Solar campaigns from existing atlas-context bodies and preserves the finite proposed continuation. Positions are for reading, not orbital scale.",
      "alt": "Eight home and campaign cards sit above seven bounded atlas-context briefs.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "a914b71fbaa4e073727a3253b76ce6b215881edb1018b9cebfdfb58ee52d8b6a",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D09",
      "target": "figure-c08-d09",
      "title": "Operating states, causes and recoverable transitions",
      "file": "images/diagrams/c08-d09-operating-state-vocabulary.svg",
      "original": "images/diagrams/c08-d09-operating-state-vocabulary.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-04",
        "C08-IND-15"
      ],
      "source_ids": [
        "IND-M59"
      ],
      "caption": "A shared state vocabulary distinguishes commissioning, readiness, actual work, held output and service. Individual machine contracts define their specific causes and recovery.",
      "alt": "Six state cards connect construction and isolation to readiness, working, held output and service, with accountable cancellation and inactive parked notes.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "d3459c4a5e7dc01c7d69b46ad3dc9d68cb2d43d462359ed79f509de78f51192a",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D11",
      "target": "figure-c08-d11",
      "title": "Ceres · regional relationships",
      "file": "images/diagrams/c08-d11-ceres-regions.svg",
      "original": "images/diagrams/c08-d11-ceres-regions.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-CER-03",
        "C08-CER-04"
      ],
      "source_ids": [
        "DST03",
        "CE-S1",
        "CE-L1",
        "CE-L2",
        "CE-L3"
      ],
      "caption": "Four distinct region contracts show their relationships, allowed variation and protected invariants. The full prose defines alternative routes and specific hazards.",
      "alt": "Four region cards in a connected two-by-two arrangement identify each place, its supported work and the constraint that keeps its first campaign solvable.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "974caea1fb58e4c3b02bc8cb88f8bb6dfe7aae8a25d8c1aa48f37ba6e171f0d8",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D12",
      "target": "figure-c08-d12",
      "title": "Ceres · a useful support place",
      "file": "images/diagrams/c08-d12-ceres-support.svg",
      "original": "images/diagrams/c08-d12-ceres-support.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-CER-05",
        "C08-CER-10"
      ],
      "source_ids": [
        "DST03"
      ],
      "caption": "The established support stages are shown with conventional occupancy, material custody and optional growth. Stage order describes useful commissioning relationships rather than an all-buildings gate.",
      "alt": "Five named support stages run beside three independent requirements: commissioned habitation, actual custody and a valid small stopping point.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "436cc7be7e6378b0686df94ec2671b05f635b403ed00d2ec52823baa87174db9",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D13",
      "target": "figure-c08-d13",
      "title": "Ceres · three complete outings",
      "file": "images/diagrams/c08-d13-ceres-outings.svg",
      "original": "images/diagrams/c08-d13-ceres-outings.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-CER-06",
        "C08-CER-07",
        "C08-CER-08"
      ],
      "source_ids": [
        "DST03",
        "C08-CER-J01",
        "C08-CER-J02",
        "C08-CER-J03"
      ],
      "caption": "Three complete outing columns retain their distinct objectives and ordered source actions. Each interruption preserves real stock or known progress and each outing has a specific homecoming result.",
      "alt": "Three vertical journeys compare objective, five specific actions and results, worked recovery and the useful return.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "0c9ac5b982ec73b7a1dbc9beb04c9f23a3be047660b64d953f8c1217d753df39",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D14",
      "target": "figure-c08-d14",
      "title": "Europa · regional relationships",
      "file": "images/diagrams/c08-d14-europa-regions.svg",
      "original": "images/diagrams/c08-d14-europa-regions.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-EUR-03",
        "C08-EUR-04"
      ],
      "source_ids": [
        "DST04",
        "EU-S1",
        "EU-L1",
        "EU-L2",
        "EU-L3"
      ],
      "caption": "Four distinct region contracts show their relationships, allowed variation and protected invariants. The full prose defines alternative routes and specific hazards.",
      "alt": "Four region cards in a connected two-by-two arrangement identify each place, its supported work and the constraint that keeps its first campaign solvable.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "2ad4b219102db913282172b44f909e999066572c076a63531596c2f8b4a4a8ea",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D15",
      "target": "figure-c08-d15",
      "title": "Europa · a useful support place",
      "file": "images/diagrams/c08-d15-europa-support.svg",
      "original": "images/diagrams/c08-d15-europa-support.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-EUR-05",
        "C08-EUR-10"
      ],
      "source_ids": [
        "DST04"
      ],
      "caption": "The established support stages are shown with conventional occupancy, material custody and optional growth. Stage order describes useful commissioning relationships rather than an all-buildings gate.",
      "alt": "Five named support stages run beside three independent requirements: commissioned habitation, actual custody and a valid small stopping point.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "5b3dd6f8bc8699abe5eb5b6c61774de4174889fdd0367530ef8d859450b59a6f",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D16",
      "target": "figure-c08-d16",
      "title": "Europa · three complete outings",
      "file": "images/diagrams/c08-d16-europa-outings.svg",
      "original": "images/diagrams/c08-d16-europa-outings.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-EUR-06",
        "C08-EUR-07",
        "C08-EUR-08"
      ],
      "source_ids": [
        "DST04",
        "C08-EUR-J01",
        "C08-EUR-J02",
        "C08-EUR-J03"
      ],
      "caption": "Three complete outing columns retain their distinct objectives and ordered source actions. Each interruption preserves real stock or known progress and each outing has a specific homecoming result.",
      "alt": "Three vertical journeys compare objective, five specific actions and results, worked recovery and the useful return.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "97d72f3b072ab901400fea7ce24318716e58380137a5350a6cb7aaee5626f17d",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D17",
      "target": "figure-c08-d17",
      "title": "Io · regional relationships",
      "file": "images/diagrams/c08-d17-io-regions.svg",
      "original": "images/diagrams/c08-d17-io-regions.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IO-03",
        "C08-IO-04"
      ],
      "source_ids": [
        "DST05",
        "IO-S1",
        "IO-L1",
        "IO-L2",
        "IO-L3"
      ],
      "caption": "Four distinct region contracts show their relationships, allowed variation and protected invariants. The full prose defines alternative routes and specific hazards.",
      "alt": "Four region cards in a connected two-by-two arrangement identify each place, its supported work and the constraint that keeps its first campaign solvable.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "2668abac9cf914c9d30335ca7e0c9caf6d6169dd54ca9e4dcc6a2e7ea186af68",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D18",
      "target": "figure-c08-d18",
      "title": "Io · a useful support place",
      "file": "images/diagrams/c08-d18-io-support.svg",
      "original": "images/diagrams/c08-d18-io-support.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IO-05",
        "C08-IO-10"
      ],
      "source_ids": [
        "DST05"
      ],
      "caption": "The established support stages are shown with conventional occupancy, material custody and optional growth. Stage order describes useful commissioning relationships rather than an all-buildings gate.",
      "alt": "Five named support stages run beside three independent requirements: commissioned habitation, actual custody and a valid small stopping point.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "071e60fb1d0a60b1861c302f7e57fe5d015dd5d6ad238b1d6131a2286a9e1c75",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D19",
      "target": "figure-c08-d19",
      "title": "Io · three complete outings",
      "file": "images/diagrams/c08-d19-io-outings.svg",
      "original": "images/diagrams/c08-d19-io-outings.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IO-06",
        "C08-IO-07",
        "C08-IO-08"
      ],
      "source_ids": [
        "DST05",
        "C08-IO-J01",
        "C08-IO-J02",
        "C08-IO-J03"
      ],
      "caption": "Three complete outing columns retain their distinct objectives and ordered source actions. Each interruption preserves real stock or known progress and each outing has a specific homecoming result.",
      "alt": "Three vertical journeys compare objective, five specific actions and results, worked recovery and the useful return.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "bab32e7ad823fd75cbf28c9b23fbc115d6e97f579207b175f0c37bbca05a932c",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D20",
      "target": "figure-c08-d20",
      "title": "Titan · regional relationships",
      "file": "images/diagrams/c08-d20-titan-regions.svg",
      "original": "images/diagrams/c08-d20-titan-regions.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-TIT-03",
        "C08-TIT-04"
      ],
      "source_ids": [
        "DST06",
        "TI-S1",
        "TI-L1",
        "TI-L2",
        "TI-L3"
      ],
      "caption": "Four distinct region contracts show their relationships, allowed variation and protected invariants. The full prose defines alternative routes and specific hazards.",
      "alt": "Four region cards in a connected two-by-two arrangement identify each place, its supported work and the constraint that keeps its first campaign solvable.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "38b742295c86bf6608396d1c27b5124280e67ddf5a68db4f476751d8459f05f5",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D21",
      "target": "figure-c08-d21",
      "title": "Titan · a useful support place",
      "file": "images/diagrams/c08-d21-titan-support.svg",
      "original": "images/diagrams/c08-d21-titan-support.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-TIT-05",
        "C08-TIT-10"
      ],
      "source_ids": [
        "DST06"
      ],
      "caption": "The established support stages are shown with conventional occupancy, material custody and optional growth. Stage order describes useful commissioning relationships rather than an all-buildings gate.",
      "alt": "Five named support stages run beside three independent requirements: commissioned habitation, actual custody and a valid small stopping point.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "18438e7f27b904112462dd9d1a4f18f47a89a808f0e8dd581231205da5b955c5",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D22",
      "target": "figure-c08-d22",
      "title": "Titan · three complete outings",
      "file": "images/diagrams/c08-d22-titan-outings.svg",
      "original": "images/diagrams/c08-d22-titan-outings.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-TIT-06",
        "C08-TIT-07",
        "C08-TIT-08"
      ],
      "source_ids": [
        "DST06",
        "C08-TIT-J01",
        "C08-TIT-J02",
        "C08-TIT-J03"
      ],
      "caption": "Three complete outing columns retain their distinct objectives and ordered source actions. Each interruption preserves real stock or known progress and each outing has a specific homecoming result.",
      "alt": "Three vertical journeys compare objective, five specific actions and results, worked recovery and the useful return.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "c50b7d90318b86e8092a2bbc4867389e3f139705e8347634f44780796823d115",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D23",
      "target": "figure-c08-d23",
      "title": "Pluto · regional relationships",
      "file": "images/diagrams/c08-d23-pluto-regions.svg",
      "original": "images/diagrams/c08-d23-pluto-regions.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-PLU-03",
        "C08-PLU-04"
      ],
      "source_ids": [
        "DST07",
        "PL-S1",
        "PL-L1",
        "PL-L2",
        "PL-L3"
      ],
      "caption": "Four distinct region contracts show their relationships, allowed variation and protected invariants. The full prose defines alternative routes and specific hazards.",
      "alt": "Four region cards in a connected two-by-two arrangement identify each place, its supported work and the constraint that keeps its first campaign solvable.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "5097665f67a4ffc76637bd849e0c40f89d911943a05d7b9aad6db55264f732e4",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D24",
      "target": "figure-c08-d24",
      "title": "Pluto · a useful support place",
      "file": "images/diagrams/c08-d24-pluto-support.svg",
      "original": "images/diagrams/c08-d24-pluto-support.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-PLU-05",
        "C08-PLU-10"
      ],
      "source_ids": [
        "DST07"
      ],
      "caption": "The established support stages are shown with conventional occupancy, material custody and optional growth. Stage order describes useful commissioning relationships rather than an all-buildings gate.",
      "alt": "Five named support stages run beside three independent requirements: commissioned habitation, actual custody and a valid small stopping point.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "b77afe52fd8faa1ad8c1bd88bd45052f91868b9bca8999e8df195420946b0d1e",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D25",
      "target": "figure-c08-d25",
      "title": "Pluto · three complete outings",
      "file": "images/diagrams/c08-d25-pluto-outings.svg",
      "original": "images/diagrams/c08-d25-pluto-outings.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-PLU-06",
        "C08-PLU-07",
        "C08-PLU-08"
      ],
      "source_ids": [
        "DST07",
        "C08-PLU-J01",
        "C08-PLU-J02",
        "C08-PLU-J03"
      ],
      "caption": "Three complete outing columns retain their distinct objectives and ordered source actions. Each interruption preserves real stock or known progress and each outing has a specific homecoming result.",
      "alt": "Three vertical journeys compare objective, five specific actions and results, worked recovery and the useful return.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "f86170144a02e0cdd7bded4afeafb9130d9d6979f29426193731beab2b586a12",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D26",
      "target": "figure-c08-d26",
      "title": "Cairn · regional relationships",
      "file": "images/diagrams/c08-d26-cairn-regions.svg",
      "original": "images/diagrams/c08-d26-cairn-regions.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-CAI-03",
        "C08-CAI-04"
      ],
      "source_ids": [
        "DST08",
        "CA-S1",
        "CA-L1",
        "CA-L2",
        "CA-L3"
      ],
      "caption": "Four distinct region contracts show their relationships, allowed variation and protected invariants. The full prose defines alternative routes and specific hazards.",
      "alt": "Four region cards in a connected two-by-two arrangement identify each place, its supported work and the constraint that keeps its first campaign solvable.",
      "panels": [],
      "spoiler": true,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "0dd11b72a817c5fbfffe73ba70037da07da0b8045d806df17dd539f98cefac53",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D27",
      "target": "figure-c08-d27",
      "title": "Cairn · a useful support place",
      "file": "images/diagrams/c08-d27-cairn-support.svg",
      "original": "images/diagrams/c08-d27-cairn-support.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-CAI-05",
        "C08-CAI-10"
      ],
      "source_ids": [
        "DST08"
      ],
      "caption": "The established support stages are shown with conventional occupancy, material custody and optional growth. Stage order describes useful commissioning relationships rather than an all-buildings gate.",
      "alt": "Five named support stages run beside three independent requirements: commissioned habitation, actual custody and a valid small stopping point.",
      "panels": [],
      "spoiler": true,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "10621574b66730835bc9df87ff346c95cc6a3898866ad723647559e1492022e8",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D28",
      "target": "figure-c08-d28",
      "title": "Cairn · three complete outings",
      "file": "images/diagrams/c08-d28-cairn-outings.svg",
      "original": "images/diagrams/c08-d28-cairn-outings.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-CAI-06",
        "C08-CAI-07",
        "C08-CAI-08"
      ],
      "source_ids": [
        "DST08",
        "C08-CAI-J01",
        "C08-CAI-J02",
        "C08-CAI-J03"
      ],
      "caption": "Three complete outing columns retain their distinct objectives and ordered source actions. Each interruption preserves real stock or known progress and each outing has a specific homecoming result.",
      "alt": "Three vertical journeys compare objective, five specific actions and results, worked recovery and the useful return.",
      "panels": [],
      "spoiler": true,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "a4885776f2b8f6c66900ab17a7064c8f541b593cb478e47f4adee0d40868b47f",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D29",
      "target": "figure-c08-d29",
      "title": "Morrow · regional relationships",
      "file": "images/diagrams/c08-d29-morrow-regions.svg",
      "original": "images/diagrams/c08-d29-morrow-regions.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-MOR-03",
        "C08-MOR-04"
      ],
      "source_ids": [
        "DST09",
        "MR-S1",
        "MR-L1",
        "MR-L2",
        "MR-L3"
      ],
      "caption": "Four distinct region contracts show their relationships, allowed variation and protected invariants. The full prose defines alternative routes and specific hazards.",
      "alt": "Four region cards in a connected two-by-two arrangement identify each place, its supported work and the constraint that keeps its first campaign solvable.",
      "panels": [],
      "spoiler": true,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "a7b0e2e3048e7f97e0726a188bdea49e8debbd0b86d0b471e5d89a2342da6500",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D30",
      "target": "figure-c08-d30",
      "title": "Morrow · a useful support place",
      "file": "images/diagrams/c08-d30-morrow-support.svg",
      "original": "images/diagrams/c08-d30-morrow-support.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-MOR-05",
        "C08-MOR-10"
      ],
      "source_ids": [
        "DST09"
      ],
      "caption": "The established support stages are shown with conventional occupancy, material custody and optional growth. Stage order describes useful commissioning relationships rather than an all-buildings gate.",
      "alt": "Five named support stages run beside three independent requirements: commissioned habitation, actual custody and a valid small stopping point.",
      "panels": [],
      "spoiler": true,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "b3feafd3e94ad040b2aa5562d97cf5c3759cdd173e6566e353a131dd7dca8ca4",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D31",
      "target": "figure-c08-d31",
      "title": "Morrow · three complete outings",
      "file": "images/diagrams/c08-d31-morrow-outings.svg",
      "original": "images/diagrams/c08-d31-morrow-outings.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-MOR-06",
        "C08-MOR-07",
        "C08-MOR-08"
      ],
      "source_ids": [
        "DST09",
        "C08-MOR-J01",
        "C08-MOR-J02",
        "C08-MOR-J03"
      ],
      "caption": "Three complete outing columns retain their distinct objectives and ordered source actions. Each interruption preserves real stock or known progress and each outing has a specific homecoming result.",
      "alt": "Three vertical journeys compare objective, five specific actions and results, worked recovery and the useful return.",
      "panels": [],
      "spoiler": true,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "c120c9df22fea37ff0bace0873d95fc587f7a79bedec4ed220dd2cbc070c6ed3",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D101",
      "target": "figure-c08-d101",
      "title": "IND-M01 · Carpenter and repair bench",
      "file": "images/diagrams/c08-d101-ind-m01.svg",
      "original": "images/diagrams/c08-d101-ind-m01.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-05",
        "C06-IND-01"
      ],
      "source_ids": [
        "IND-M01",
        "TEC01"
      ],
      "caption": "Carpenter and repair bench has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Carpenter and repair bench compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "f91b041fc2f51a9076bab8a8425a49c84563f86026297f677a7e5d58dc06491c",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D102",
      "target": "figure-c08-d102",
      "title": "IND-M02 · Part Fabrication Table",
      "file": "images/diagrams/c08-d102-ind-m02.svg",
      "original": "images/diagrams/c08-d102-ind-m02.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-05",
        "C06-IND-02"
      ],
      "source_ids": [
        "IND-M02",
        "TEC01",
        "TEC13"
      ],
      "caption": "Part Fabrication Table has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Part Fabrication Table compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "6bb3ed09e20bd3dd512e949aedfa751ff8e11a2f085c2955d8c3b5cac532b49e",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D103",
      "target": "figure-c08-d103",
      "title": "IND-M03 · Timber mill",
      "file": "images/diagrams/c08-d103-ind-m03.svg",
      "original": "images/diagrams/c08-d103-ind-m03.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-05",
        "C06-IND-03"
      ],
      "source_ids": [
        "IND-M03",
        "TEC01"
      ],
      "caption": "Timber mill has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Timber mill compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "6405ea96e80748dde8c5b942409297a2602815cf500665271c81e8d3820e487c",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D104",
      "target": "figure-c08-d104",
      "title": "IND-M04 · Forming press and rolling stand",
      "file": "images/diagrams/c08-d104-ind-m04.svg",
      "original": "images/diagrams/c08-d104-ind-m04.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-05",
        "C08-IND-07",
        "C06-IND-04"
      ],
      "source_ids": [
        "IND-M04",
        "TEC03"
      ],
      "caption": "Forming press and rolling stand has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Forming press and rolling stand compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "6cdbf52ce7e197569834194656ffb90b3cc3bc6b61155fd31841a877a786c8e3",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D105",
      "target": "figure-c08-d105",
      "title": "IND-M05 · Drawing and precision bench",
      "file": "images/diagrams/c08-d105-ind-m05.svg",
      "original": "images/diagrams/c08-d105-ind-m05.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-05",
        "C06-IND-05"
      ],
      "source_ids": [
        "IND-M05",
        "TEC03"
      ],
      "caption": "Drawing and precision bench has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Drawing and precision bench compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "cabc73870fdbfc956862fa0ebeef16469634dc8eb02a6d87263b09d3f68707c6",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D106",
      "target": "figure-c08-d106",
      "title": "IND-M06 · Carbon retort",
      "file": "images/diagrams/c08-d106-ind-m06.svg",
      "original": "images/diagrams/c08-d106-ind-m06.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-05",
        "C08-IND-07",
        "C06-IND-06"
      ],
      "source_ids": [
        "IND-M06",
        "TEC03"
      ],
      "caption": "Carbon retort has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Carbon retort compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "96575c46e85350e11a5711752e8e5d47ed03f74394c65d65729d00214abf8267",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D107",
      "target": "figure-c08-d107",
      "title": "IND-M07 · Alloy hearth",
      "file": "images/diagrams/c08-d107-ind-m07.svg",
      "original": "images/diagrams/c08-d107-ind-m07.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-05",
        "C08-IND-07",
        "C06-IND-07"
      ],
      "source_ids": [
        "IND-M07",
        "TEC03"
      ],
      "caption": "Alloy hearth has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Alloy hearth compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "b35f1df87b6818eb97f31277e080ae4e793a0bb920b5cd4eaa7535e4a1f0880c",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D108",
      "target": "figure-c08-d108",
      "title": "IND-M08 · Controlled steel furnace",
      "file": "images/diagrams/c08-d108-ind-m08.svg",
      "original": "images/diagrams/c08-d108-ind-m08.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-05",
        "C08-IND-07",
        "C06-IND-08"
      ],
      "source_ids": [
        "IND-M08",
        "TEC03"
      ],
      "caption": "Controlled steel furnace has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Controlled steel furnace compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "b1ca318f8b78f036b055d5325b712eba67af7645de8bad150c90dbb076aad788",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D109",
      "target": "figure-c08-d109",
      "title": "IND-M09 · Kiln and ceramic forming station",
      "file": "images/diagrams/c08-d109-ind-m09.svg",
      "original": "images/diagrams/c08-d109-ind-m09.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-05",
        "C06-IND-09"
      ],
      "source_ids": [
        "IND-M09",
        "TEC02"
      ],
      "caption": "Kiln and ceramic forming station has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Kiln and ceramic forming station compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "d25fba1003e561270de52c69b08dfbd8b1e0f2e9ceb66f55086cda7be1da879a",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D110",
      "target": "figure-c08-d110",
      "title": "IND-M10 · Panel and laminate table",
      "file": "images/diagrams/c08-d110-ind-m10.svg",
      "original": "images/diagrams/c08-d110-ind-m10.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-09",
        "C06-IND-10"
      ],
      "source_ids": [
        "IND-M10",
        "TEC02",
        "TEC04"
      ],
      "caption": "Panel and laminate table has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Panel and laminate table compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "f7df2d6b614b4d50be070bb414e5ce8a61f305c079a9b9babe97e8b4485bcd26",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D111",
      "target": "figure-c08-d111",
      "title": "IND-M11 · Loom and textile station",
      "file": "images/diagrams/c08-d111-ind-m11.svg",
      "original": "images/diagrams/c08-d111-ind-m11.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-09",
        "C06-IND-11"
      ],
      "source_ids": [
        "IND-M11",
        "TEC04"
      ],
      "caption": "Loom and textile station has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Loom and textile station compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "5b1285850bb6f6ac873e1c8c5adec016873c0493d6b719829ecdb17107a0f6f4",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D112",
      "target": "figure-c08-d112",
      "title": "IND-M12 · Seal and filter bench",
      "file": "images/diagrams/c08-d112-ind-m12.svg",
      "original": "images/diagrams/c08-d112-ind-m12.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-09",
        "C06-IND-12"
      ],
      "source_ids": [
        "IND-M12",
        "TEC04",
        "TEC12"
      ],
      "caption": "Seal and filter bench has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Seal and filter bench compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "e100fa3e661929bed309cbe3ffa5bc92a81a25e077992f5fe1a00419027bdc86",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D113",
      "target": "figure-c08-d113",
      "title": "IND-M13 · Managed cultivation beds",
      "file": "images/diagrams/c08-d113-ind-m13.svg",
      "original": "images/diagrams/c08-d113-ind-m13.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-09",
        "C06-IND-13"
      ],
      "source_ids": [
        "IND-M13",
        "TEC05"
      ],
      "caption": "Managed cultivation beds has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Managed cultivation beds compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "5a984d414cd027967883635dc552fce29d7819ca2ccefe62c9e7587ec731b8d6",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D114",
      "target": "figure-c08-d114",
      "title": "IND-M14 · Biological extractor and fermenter",
      "file": "images/diagrams/c08-d114-ind-m14.svg",
      "original": "images/diagrams/c08-d114-ind-m14.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-09",
        "C06-IND-14"
      ],
      "source_ids": [
        "IND-M14",
        "TEC05",
        "TEC08"
      ],
      "caption": "Biological extractor and fermenter has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Biological extractor and fermenter compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "fbcb3a0bb758c257e0c0de45cfcd8bbf12ed1ebef57ac5793355a93c8a402c10",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D115",
      "target": "figure-c08-d115",
      "title": "IND-M15 · Pump installation",
      "file": "images/diagrams/c08-d115-ind-m15.svg",
      "original": "images/diagrams/c08-d115-ind-m15.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-13",
        "C06-IND-15"
      ],
      "source_ids": [
        "IND-M15",
        "TEC06"
      ],
      "caption": "Pump installation has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Pump installation compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "73baf23f01c95fb6e60e92c7d1bac87fdc9ae632328d53fdbbe3fb9c60fc7a7d",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D116",
      "target": "figure-c08-d116",
      "title": "IND-M16 · Water treatment station",
      "file": "images/diagrams/c08-d116-ind-m16.svg",
      "original": "images/diagrams/c08-d116-ind-m16.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-13",
        "C06-IND-16"
      ],
      "source_ids": [
        "IND-M16",
        "TEC06"
      ],
      "caption": "Water treatment station has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Water treatment station compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "4b95fb2adc131ccae5c2b05b79dc183d9d4d30442220c3a1a30194710a1ee7fd",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D117",
      "target": "figure-c08-d117",
      "title": "IND-M17 · Reservoir and manifold",
      "file": "images/diagrams/c08-d117-ind-m17.svg",
      "original": "images/diagrams/c08-d117-ind-m17.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-13",
        "C06-IND-17"
      ],
      "source_ids": [
        "IND-M17",
        "TEC06"
      ],
      "caption": "Reservoir and manifold has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Reservoir and manifold compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "e248e10cc3fb63dab1c1fbd8b7770cf6f821fb577900b85705daf04e4d95a920",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D118",
      "target": "figure-c08-d118",
      "title": "IND-M18 · Crusher",
      "file": "images/diagrams/c08-d118-ind-m18.svg",
      "original": "images/diagrams/c08-d118-ind-m18.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-07",
        "C06-IND-18"
      ],
      "source_ids": [
        "IND-M18",
        "TEC08"
      ],
      "caption": "Crusher has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Crusher compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "fb0bda7da4dd993920f7002ea13ce071caedd20449a49540e852a9581f67152d",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D119",
      "target": "figure-c08-d119",
      "title": "IND-M19 · Washing and classification table",
      "file": "images/diagrams/c08-d119-ind-m19.svg",
      "original": "images/diagrams/c08-d119-ind-m19.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-07",
        "C06-IND-19"
      ],
      "source_ids": [
        "IND-M19",
        "TEC08"
      ],
      "caption": "Washing and classification table has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Washing and classification table compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "f17be6f9e71344b3c420b498200658ab60e0da0f45ca73dfdd25463fc40ed7cc",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D120",
      "target": "figure-c08-d120",
      "title": "IND-M20 · Concentration separator",
      "file": "images/diagrams/c08-d120-ind-m20.svg",
      "original": "images/diagrams/c08-d120-ind-m20.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-07",
        "C06-IND-20"
      ],
      "source_ids": [
        "IND-M20",
        "TEC08"
      ],
      "caption": "Concentration separator has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Concentration separator compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "034670c7562d71413aa0eabd509403e5566550dd51be699811d06374da5bb629",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D121",
      "target": "figure-c08-d121",
      "title": "IND-M21 · Electrical materials cell",
      "file": "images/diagrams/c08-d121-ind-m21.svg",
      "original": "images/diagrams/c08-d121-ind-m21.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-08",
        "C06-IND-21"
      ],
      "source_ids": [
        "IND-M21",
        "TEC08"
      ],
      "caption": "Electrical materials cell has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Electrical materials cell compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "e266974940e0bfb8fe6f04a7192c15ff21bbace4e67ffbb6f57d2058e5fb8c3f",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D122",
      "target": "figure-c08-d122",
      "title": "IND-M22 · High-duty alloy and treatment furnace",
      "file": "images/diagrams/c08-d122-ind-m22.svg",
      "original": "images/diagrams/c08-d122-ind-m22.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-08",
        "C06-IND-22"
      ],
      "source_ids": [
        "IND-M22",
        "TEC03",
        "TEC08"
      ],
      "caption": "High-duty alloy and treatment furnace has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for High-duty alloy and treatment furnace compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "0827e02d6c760bd091f94193344c6e9afc37ffddfb5cc0c2a76ef6111e335592",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D123",
      "target": "figure-c08-d123",
      "title": "IND-M23 · Reaction vessel",
      "file": "images/diagrams/c08-d123-ind-m23.svg",
      "original": "images/diagrams/c08-d123-ind-m23.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-08",
        "C08-IND-10",
        "C06-IND-23"
      ],
      "source_ids": [
        "IND-M23",
        "TEC08"
      ],
      "caption": "Reaction vessel has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Reaction vessel compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "a389542ce09c2c6f60480cb99b84cc7b7ceae3b10da527effcd199f1efdc96bb",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D124",
      "target": "figure-c08-d124",
      "title": "IND-M24 · Evaporation and crystallization works",
      "file": "images/diagrams/c08-d124-ind-m24.svg",
      "original": "images/diagrams/c08-d124-ind-m24.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-08",
        "C06-IND-24"
      ],
      "source_ids": [
        "IND-M24",
        "TEC08"
      ],
      "caption": "Evaporation and crystallization works has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Evaporation and crystallization works compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "53371ce02604221109a2cbd40125d02411199cdf9853beb8f1e437ce2d7754d7",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D125",
      "target": "figure-c08-d125",
      "title": "IND-M25 · Electrolytic separator",
      "file": "images/diagrams/c08-d125-ind-m25.svg",
      "original": "images/diagrams/c08-d125-ind-m25.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-08",
        "C06-IND-25"
      ],
      "source_ids": [
        "IND-M25",
        "TEC08"
      ],
      "caption": "Electrolytic separator has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Electrolytic separator compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "5aa21275d7ebb7f6f67da63afadecaa0a21ff3e132ad64c2ae64afef1bfc3f7b",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D126",
      "target": "figure-c08-d126",
      "title": "IND-M26 · Gas conditioning and compressor",
      "file": "images/diagrams/c08-d126-ind-m26.svg",
      "original": "images/diagrams/c08-d126-ind-m26.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-08",
        "C06-IND-26"
      ],
      "source_ids": [
        "IND-M26",
        "TEC08",
        "TEC12"
      ],
      "caption": "Gas conditioning and compressor has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Gas conditioning and compressor compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "cda3530e9f971c65507ecc1164779b3ed77dae1262e2944c3d8294e43f7b8783",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D127",
      "target": "figure-c08-d127",
      "title": "IND-M27 · Phase-conditioning unit",
      "file": "images/diagrams/c08-d127-ind-m27.svg",
      "original": "images/diagrams/c08-d127-ind-m27.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-08",
        "C06-IND-27"
      ],
      "source_ids": [
        "IND-M27",
        "TEC08"
      ],
      "caption": "Phase-conditioning unit has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Phase-conditioning unit compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "08b22b86cca38a779ffbab15b72f862267fe365e991ec3e5a8679ffa06d7cfdb",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D128",
      "target": "figure-c08-d128",
      "title": "IND-M28 · Chemical washing and recovery train",
      "file": "images/diagrams/c08-d128-ind-m28.svg",
      "original": "images/diagrams/c08-d128-ind-m28.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-08",
        "C06-IND-28"
      ],
      "source_ids": [
        "IND-M28",
        "TEC08"
      ],
      "caption": "Chemical washing and recovery train has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Chemical washing and recovery train compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "82f743c05a9c40197d771db5ead2b62e6689d13bf128d38268e01aaf6668adba",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D129",
      "target": "figure-c08-d129",
      "title": "IND-M29 · Crystal and optical growth chamber",
      "file": "images/diagrams/c08-d129-ind-m29.svg",
      "original": "images/diagrams/c08-d129-ind-m29.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-08",
        "C08-IND-10",
        "C06-IND-29"
      ],
      "source_ids": [
        "IND-M29",
        "TEC08",
        "TEC09"
      ],
      "caption": "Crystal and optical growth chamber has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Crystal and optical growth chamber compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "2ccbb10e0b3736f5bc3956d289a638187e56f1699651e3278e622c90cb01d109",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D130",
      "target": "figure-c08-d130",
      "title": "IND-M30 · Polymer and composite works",
      "file": "images/diagrams/c08-d130-ind-m30.svg",
      "original": "images/diagrams/c08-d130-ind-m30.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-08",
        "C06-IND-30"
      ],
      "source_ids": [
        "IND-M30",
        "TEC08"
      ],
      "caption": "Polymer and composite works has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Polymer and composite works compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "4071ed3b7d957af266dd0234fe7254a453f5794b3e60a7d369c59adc370bff1f",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D131",
      "target": "figure-c08-d131",
      "title": "IND-M31 · Scrap and residue reclaimer",
      "file": "images/diagrams/c08-d131-ind-m31.svg",
      "original": "images/diagrams/c08-d131-ind-m31.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-17",
        "C06-IND-31"
      ],
      "source_ids": [
        "IND-M31",
        "TEC08"
      ],
      "caption": "Scrap and residue reclaimer has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Scrap and residue reclaimer compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "8e216e1cfb77d03eafba45bf998051551512884c83063add16da7fae0988f632",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D132",
      "target": "figure-c08-d132",
      "title": "IND-M32 · Workshop dynamo and source assemblies",
      "file": "images/diagrams/c08-d132-ind-m32.svg",
      "original": "images/diagrams/c08-d132-ind-m32.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-12",
        "C08-IND-06",
        "C06-IND-32"
      ],
      "source_ids": [
        "IND-M32",
        "TEC07"
      ],
      "caption": "Workshop dynamo and source assemblies has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Workshop dynamo and source assemblies compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "e5673288b642e012cf60f48685d3cc1abb6d88fae7838b8a9f3943ea7af12862",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D133",
      "target": "figure-c08-d133",
      "title": "IND-M33 · Boiler, engine, and condenser plant",
      "file": "images/diagrams/c08-d133-ind-m33.svg",
      "original": "images/diagrams/c08-d133-ind-m33.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-12",
        "C08-IND-06",
        "C06-IND-33"
      ],
      "source_ids": [
        "IND-M33",
        "TEC07"
      ],
      "caption": "Boiler, engine, and condenser plant has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Boiler, engine, and condenser plant compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "db9e66cb4230eca97bb48f8892c2c0438b7b1d5bae57c5beb28ca1613f33df5c",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D134",
      "target": "figure-c08-d134",
      "title": "IND-M34 · Liquid or gas fuel engine",
      "file": "images/diagrams/c08-d134-ind-m34.svg",
      "original": "images/diagrams/c08-d134-ind-m34.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-12",
        "C08-IND-06",
        "C06-IND-34"
      ],
      "source_ids": [
        "IND-M34",
        "TEC07"
      ],
      "caption": "Liquid or gas fuel engine has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Liquid or gas fuel engine compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "c0efecc1bc7d380061af5978a5f1f1eae68e5b22174ead46dddd20d21a65a7c9",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D135",
      "target": "figure-c08-d135",
      "title": "IND-M35 · Solar array and controller",
      "file": "images/diagrams/c08-d135-ind-m35.svg",
      "original": "images/diagrams/c08-d135-ind-m35.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-12",
        "C08-IND-06",
        "C06-IND-35"
      ],
      "source_ids": [
        "IND-M35",
        "TEC07"
      ],
      "caption": "Solar array and controller has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Solar array and controller compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "515170c32e8a587753d25ee9c36594263ce1b356906e029b37a885b42954088f",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D136",
      "target": "figure-c08-d136",
      "title": "IND-M36 · Thermal recovery module",
      "file": "images/diagrams/c08-d136-ind-m36.svg",
      "original": "images/diagrams/c08-d136-ind-m36.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-12",
        "C08-IND-06",
        "C06-IND-36"
      ],
      "source_ids": [
        "IND-M36",
        "TEC07",
        "TEC08"
      ],
      "caption": "Thermal recovery module has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Thermal recovery module compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "bc442bcef73d448a948f54f295612334d40452c5daf02097f11a5769d39452fa",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D137",
      "target": "figure-c08-d137",
      "title": "IND-M37 · Stationary power bank",
      "file": "images/diagrams/c08-d137-ind-m37.svg",
      "original": "images/diagrams/c08-d137-ind-m37.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-12",
        "C08-IND-06",
        "C06-IND-37"
      ],
      "source_ids": [
        "IND-M37",
        "TEC07"
      ],
      "caption": "Stationary power bank has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Stationary power bank compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "91444a5465c746cd54af5bdb148dcda9b54075d646eee6ea3983976b600df2ea",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D138",
      "target": "figure-c08-d138",
      "title": "IND-M38 · Switchboard and distribution station",
      "file": "images/diagrams/c08-d138-ind-m38.svg",
      "original": "images/diagrams/c08-d138-ind-m38.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-12",
        "C08-IND-06",
        "C06-IND-38"
      ],
      "source_ids": [
        "IND-M38",
        "TEC07"
      ],
      "caption": "Switchboard and distribution station has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Switchboard and distribution station compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "901f629a267cf90ade501c6cacafc82217b799e812d83e7303887f773a3f623d",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D139",
      "target": "figure-c08-d139",
      "title": "IND-M39 · Field-cell charging rack",
      "file": "images/diagrams/c08-d139-ind-m39.svg",
      "original": "images/diagrams/c08-d139-ind-m39.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-12",
        "C08-IND-06",
        "C06-IND-39"
      ],
      "source_ids": [
        "IND-M39",
        "TEC07"
      ],
      "caption": "Field-cell charging rack has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Field-cell charging rack compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "6f6aed0a29d1a4696c545989f88462153b36dbb8955ceb41e39c5b8ec55aec03",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D140",
      "target": "figure-c08-d140",
      "title": "IND-M40 · Oxygen Generator — compact air-supply preparation (T1-M05)",
      "file": "images/diagrams/c08-d140-ind-m40.svg",
      "original": "images/diagrams/c08-d140-ind-m40.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-13",
        "C06-IND-40"
      ],
      "source_ids": [
        "IND-M40",
        "TEC12"
      ],
      "caption": "Oxygen Generator — compact air-supply preparation (T1-M05) has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Oxygen Generator — compact air-supply preparation (T1-M05) compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "f568dccc99804b44718d93e5e20e3b733e7ba13bd373b78cb31306640d7b6bca",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D141",
      "target": "figure-c08-d141",
      "title": "IND-M41 · Breathing-supply refill rack",
      "file": "images/diagrams/c08-d141-ind-m41.svg",
      "original": "images/diagrams/c08-d141-ind-m41.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-13",
        "C06-IND-41"
      ],
      "source_ids": [
        "IND-M41",
        "TEC12"
      ],
      "caption": "Breathing-supply refill rack has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Breathing-supply refill rack compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "f2f7712fff7d1d08d95cbf56d416392e61b4ae37ac0d3997b9a215b873786112",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D142",
      "target": "figure-c08-d142",
      "title": "IND-M42 · Seal and enclosure test cabinet",
      "file": "images/diagrams/c08-d142-ind-m42.svg",
      "original": "images/diagrams/c08-d142-ind-m42.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-13",
        "C06-IND-42"
      ],
      "source_ids": [
        "IND-M42",
        "TEC12"
      ],
      "caption": "Seal and enclosure test cabinet has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Seal and enclosure test cabinet compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "223edbfdec909f0cc5558d3e6b99b8b3a99434738d9b3878034900c18ef69a38",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D143",
      "target": "figure-c08-d143",
      "title": "IND-M43 · Habitat utility module",
      "file": "images/diagrams/c08-d143-ind-m43.svg",
      "original": "images/diagrams/c08-d143-ind-m43.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-13",
        "C06-IND-43"
      ],
      "source_ids": [
        "IND-M43",
        "TEC12"
      ],
      "caption": "Habitat utility module has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Habitat utility module compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "2c1ad69363327ed3961a97ea431f0ba2cad0f37aa56be8e93e9bde834fd6f248",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D144",
      "target": "figure-c08-d144",
      "title": "IND-M44 · Thermal service unit",
      "file": "images/diagrams/c08-d144-ind-m44.svg",
      "original": "images/diagrams/c08-d144-ind-m44.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-13",
        "C06-IND-44"
      ],
      "source_ids": [
        "IND-M44",
        "TEC12"
      ],
      "caption": "Thermal service unit has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Thermal service unit compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "9ee7ef4268db6c3a7119d47c94b67ffda61732ac3a023adb9ded82658f439828",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D145",
      "target": "figure-c08-d145",
      "title": "IND-M45 · Fuel Refinery — propellant preparation (T1-M03)",
      "file": "images/diagrams/c08-d145-ind-m45.svg",
      "original": "images/diagrams/c08-d145-ind-m45.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-06",
        "C08-IND-14",
        "C06-IND-45"
      ],
      "source_ids": [
        "IND-M45",
        "TEC08",
        "TEC14"
      ],
      "caption": "Fuel Refinery — propellant preparation (T1-M03) has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Fuel Refinery — propellant preparation (T1-M03) compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "244481af873ea0994c5b5be4c79112d5763b7b47dabd7032d5335b125b94cc30",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D146",
      "target": "figure-c08-d146",
      "title": "IND-M46 · Rocket Assembly Station",
      "file": "images/diagrams/c08-d146-ind-m46.svg",
      "original": "images/diagrams/c08-d146-ind-m46.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-06",
        "C08-IND-14",
        "C06-IND-46"
      ],
      "source_ids": [
        "IND-M46",
        "TEC13"
      ],
      "caption": "Rocket Assembly Station has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Rocket Assembly Station compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "82025700df43d3cd1a72ca826e4d6d567d7584b674b8aefa8f8101b5311c395c",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D147",
      "target": "figure-c08-d147",
      "title": "IND-M47 · Component service and test stand",
      "file": "images/diagrams/c08-d147-ind-m47.svg",
      "original": "images/diagrams/c08-d147-ind-m47.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-06",
        "C08-IND-14",
        "C06-IND-47"
      ],
      "source_ids": [
        "IND-M47",
        "TEC13"
      ],
      "caption": "Component service and test stand has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Component service and test stand compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "27e9fca2d7cfa4463bceb4fa76c78d398e6f4f6312905e68e5f08880739029f0",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D148",
      "target": "figure-c08-d148",
      "title": "IND-M48 · Launch service and recovery connections",
      "file": "images/diagrams/c08-d148-ind-m48.svg",
      "original": "images/diagrams/c08-d148-ind-m48.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-06",
        "C08-IND-14",
        "C06-IND-48"
      ],
      "source_ids": [
        "IND-M48",
        "TEC14"
      ],
      "caption": "Launch service and recovery connections has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Launch service and recovery connections compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "2ad579151b37f81510737369ede21fd9b08fc37ac67864d05a1c884edc5509d1",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D149",
      "target": "figure-c08-d149",
      "title": "IND-M49 · Suit and equipment service dock",
      "file": "images/diagrams/c08-d149-ind-m49.svg",
      "original": "images/diagrams/c08-d149-ind-m49.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-13",
        "C08-IND-14",
        "C06-IND-49"
      ],
      "source_ids": [
        "IND-M49",
        "TEC12",
        "TEC13"
      ],
      "caption": "Suit and equipment service dock has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Suit and equipment service dock compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "da58b6173cebbbecab8cde4ea6770bdc3d23b2bf192b18980f85c2cebbcc528a",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D150",
      "target": "figure-c08-d150",
      "title": "IND-M50 · Survey and optical bench",
      "file": "images/diagrams/c08-d150-ind-m50.svg",
      "original": "images/diagrams/c08-d150-ind-m50.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-10",
        "C06-IND-50"
      ],
      "source_ids": [
        "IND-M50",
        "TEC09"
      ],
      "caption": "Survey and optical bench has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Survey and optical bench compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "7b446e5532c84ddfce87cbbf45b4862c256f660428a13024ec2e871514960422",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D151",
      "target": "figure-c08-d151",
      "title": "IND-M51 · Sample laboratory",
      "file": "images/diagrams/c08-d151-ind-m51.svg",
      "original": "images/diagrams/c08-d151-ind-m51.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-10",
        "C06-IND-51"
      ],
      "source_ids": [
        "IND-M51",
        "TEC08",
        "TEC09"
      ],
      "caption": "Sample laboratory has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Sample laboratory compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "71baba49aabc2f9c893c0fe47bafeecfa3e0101f96212f4e704a03f4b5cf1b14",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D152",
      "target": "figure-c08-d152",
      "title": "IND-M52 · Sensor and control cabinet",
      "file": "images/diagrams/c08-d152-ind-m52.svg",
      "original": "images/diagrams/c08-d152-ind-m52.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-15",
        "C06-IND-52"
      ],
      "source_ids": [
        "IND-M52",
        "TEC07",
        "TEC09"
      ],
      "caption": "Sensor and control cabinet has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Sensor and control cabinet compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "f1e6dbfc57072b7b5d60ccaa48d123e45fd33b31ebb68cc527e5042bfecb4c5a",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D153",
      "target": "figure-c08-d153",
      "title": "IND-M53 · Hoist and lift installation",
      "file": "images/diagrams/c08-d153-ind-m53.svg",
      "original": "images/diagrams/c08-d153-ind-m53.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-16",
        "C06-IND-53"
      ],
      "source_ids": [
        "IND-M53",
        "TEC10"
      ],
      "caption": "Hoist and lift installation has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Hoist and lift installation compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "db0bfdb6f455f06f33d0f4fbf81033f472dccfeb6abf2a221684b0c0eab208d9",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D154",
      "target": "figure-c08-d154",
      "title": "IND-M54 · Conveyor and loading bay",
      "file": "images/diagrams/c08-d154-ind-m54.svg",
      "original": "images/diagrams/c08-d154-ind-m54.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-16",
        "C06-IND-54"
      ],
      "source_ids": [
        "IND-M54",
        "TEC11"
      ],
      "caption": "Conveyor and loading bay has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Conveyor and loading bay compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "183535acaa3529424f6db40b2fc089a05ca8e4eb52756506f419a7c8578ea559",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D155",
      "target": "figure-c08-d155",
      "title": "IND-M55 · Stockroom and order desk",
      "file": "images/diagrams/c08-d155-ind-m55.svg",
      "original": "images/diagrams/c08-d155-ind-m55.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-16",
        "C06-IND-55"
      ],
      "source_ids": [
        "IND-M55",
        "TEC11"
      ],
      "caption": "Stockroom and order desk has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Stockroom and order desk compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "377b275be4f3ec1738996e05ac2c23683adedaf45b1a59a7dfbd883b5d4be293",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D156",
      "target": "figure-c08-d156",
      "title": "IND-M56 · Freight dispatch and receiving service",
      "file": "images/diagrams/c08-d156-ind-m56.svg",
      "original": "images/diagrams/c08-d156-ind-m56.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-16",
        "C06-IND-56"
      ],
      "source_ids": [
        "IND-M56",
        "TEC11"
      ],
      "caption": "Freight dispatch and receiving service has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Freight dispatch and receiving service compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "0aa46bde134f3ed12d4e1e4766e40008f51d4be3fc1fd6c7c7f51ac5876dc6a4",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D157",
      "target": "figure-c08-d157",
      "title": "IND-M57 · Bounded excavation assembly",
      "file": "images/diagrams/c08-d157-ind-m57.svg",
      "original": "images/diagrams/c08-d157-ind-m57.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-07",
        "C08-IND-20",
        "C06-IND-57"
      ],
      "source_ids": [
        "IND-M57",
        "EQ05",
        "TEC08"
      ],
      "caption": "Bounded excavation assembly has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Bounded excavation assembly compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "5d46446cc6db88782ab716ab951f6e2a2a21c9e1ef65237094c2afbb1a7ebc00",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D158",
      "target": "figure-c08-d158",
      "title": "IND-M58 · Frontier vehicle service bay",
      "file": "images/diagrams/c08-d158-ind-m58.svg",
      "original": "images/diagrams/c08-d158-ind-m58.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-10",
        "C08-IND-16",
        "C06-IND-58"
      ],
      "source_ids": [
        "IND-M58",
        "TEC13"
      ],
      "caption": "Frontier vehicle service bay has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Frontier vehicle service bay compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "8390eaf440b02fed509fcf5fbc65b2a68e5956fb358ead2779cb13b082d3b02c",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D159",
      "target": "figure-c08-d159",
      "title": "IND-M59 · Parallel production line",
      "file": "images/diagrams/c08-d159-ind-m59.svg",
      "original": "images/diagrams/c08-d159-ind-m59.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-07",
        "C08-IND-15",
        "C06-IND-59"
      ],
      "source_ids": [
        "IND-M59",
        "TEC01",
        "TEC03",
        "TEC08"
      ],
      "caption": "Parallel production line has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Parallel production line compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "e9e76d8f8232881f1d217458a1bf1f18f82b387204a202480bb95286e72224d1",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D160",
      "target": "figure-c08-d160",
      "title": "IND-M60 · Shielded materials laboratory",
      "file": "images/diagrams/c08-d160-ind-m60.svg",
      "original": "images/diagrams/c08-d160-ind-m60.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-18",
        "C06-IND-60"
      ],
      "source_ids": [
        "IND-M60",
        "TEC08"
      ],
      "caption": "Shielded materials laboratory has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Shielded materials laboratory compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "bf2d414a824abbb3df1c91dd4f4dc3497a4cf3c7637be7cc36cb9b80d62af18d",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D161",
      "target": "figure-c08-d161",
      "title": "IND-M61 · Shielded fission power plant",
      "file": "images/diagrams/c08-d161-ind-m61.svg",
      "original": "images/diagrams/c08-d161-ind-m61.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-18",
        "C06-IND-61"
      ],
      "source_ids": [
        "IND-M61",
        "TEC07"
      ],
      "caption": "Shielded fission power plant has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Shielded fission power plant compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "359ad97ab67f222a4f1543ce72308f2368cdbbe739e4cae7bdf7cb535a5c80cd",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D162",
      "target": "figure-c08-d162",
      "title": "IND-M62 · Fusion research plant",
      "file": "images/diagrams/c08-d162-ind-m62.svg",
      "original": "images/diagrams/c08-d162-ind-m62.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-18",
        "C06-IND-62"
      ],
      "source_ids": [
        "IND-M62",
        "TEC07"
      ],
      "caption": "Fusion research plant has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Fusion research plant compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "75f418bfd6a8c9bb6425fbe71654291ea98bb3e2a1f3ad12ee9d0029cc7b8b33",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D163",
      "target": "figure-c08-d163",
      "title": "IND-M63 · Precision field apparatus",
      "file": "images/diagrams/c08-d163-ind-m63.svg",
      "original": "images/diagrams/c08-d163-ind-m63.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-18",
        "C06-IND-63"
      ],
      "source_ids": [
        "IND-M63",
        "TEC08"
      ],
      "caption": "Precision field apparatus has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Precision field apparatus compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "f71688996ce2c00c944552936250d57676de4035cff5d1929335e0bcdb8dde5d",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D164",
      "target": "figure-c08-d164",
      "title": "IND-M64 · Navigation and transit assembly",
      "file": "images/diagrams/c08-d164-ind-m64.svg",
      "original": "images/diagrams/c08-d164-ind-m64.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-18",
        "C06-IND-64"
      ],
      "source_ids": [
        "IND-M64",
        "TEC09",
        "TEC13"
      ],
      "caption": "Navigation and transit assembly has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Navigation and transit assembly compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "ec1b141f4cbc6807f7bfc85d4fed19e8e1c86cd6f6376827fcbb0e24d4f043c0",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D165",
      "target": "figure-c08-d165",
      "title": "IND-M65 · Advanced route terminal",
      "file": "images/diagrams/c08-d165-ind-m65.svg",
      "original": "images/diagrams/c08-d165-ind-m65.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-18",
        "C06-IND-65"
      ],
      "source_ids": [
        "IND-M65",
        "TEC11",
        "TEC14"
      ],
      "caption": "Advanced route terminal has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Advanced route terminal compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "ff90d7245ff0213db2d2f7d5f3daafa87957285c3e6c263cc89b495a5985c7e3",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D166",
      "target": "figure-c08-d166",
      "title": "IND-M66 · Modular powered equipment dock",
      "file": "images/diagrams/c08-d166-ind-m66.svg",
      "original": "images/diagrams/c08-d166-ind-m66.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-IND-13",
        "C08-IND-19",
        "C06-IND-66"
      ],
      "source_ids": [
        "IND-M66",
        "TEC12",
        "TEC13"
      ],
      "caption": "Modular powered equipment dock has a specific work responsibility, physical connection relationship, interruption contract and progression alternative. The sheet preserves their exact structured wording and identifies related typed duties.",
      "alt": "A full operation sheet for Modular powered equipment dock compares its actual work and progression role, then separates physical access from interruption recovery and shows the supported alternative.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "6ba9cd0be5e0ce5f3a5a2338b88cd209c1a4bcb00aed4308542c3b57e758bf3a",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D170",
      "target": "figure-c08-d170",
      "title": "Craft assembly · the established seven stages",
      "file": "images/diagrams/c08-d170-craft-assembly.svg",
      "original": "images/diagrams/c08-d170-craft-assembly.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-CRAFT-04",
        "C08-CRAFT-09",
        "C08-CRAFT-11"
      ],
      "source_ids": [
        "T1-V01",
        "REF09",
        "REF10",
        "HUL01",
        "HUL06"
      ],
      "caption": "Seven authored construction stages preserve their source order and visible result. Each family uses its own actual parts and suitable berth; final geometry is tested separately.",
      "alt": "Seven connected construction stages run from foundation and gantry through frame, services, modules, shell and interior choices to whole-configuration commissioning.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "6a9f829323c1ed55dcb17a80257317a232173348ed03e019ca0d19f87dd09913",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D171",
      "target": "figure-c08-d171",
      "title": "Craft operation · preparation, passage, service and return",
      "file": "images/diagrams/c08-d171-craft-operating-states.svg",
      "original": "images/diagrams/c08-d171-craft-operating-states.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-CRAFT-21",
        "C08-CRAFT-06",
        "C08-CRAFT-11"
      ],
      "source_ids": [
        "T1-V01",
        "REF06",
        "REF07",
        "HUL01",
        "HUL06"
      ],
      "caption": "The shared state contract links preparation to supported travel and return. The selected craft retains its own component and movement requirements; this does not certify Tier 2 or Tier 3 destinations.",
      "alt": "Eight connected operating states distinguish inactive parking, isolated service, readiness, occupied preparation, departure, supported passage, secured arrival and return.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "b6290e917b72f762df93b381a831a8ea689145d24e2600c92d0c43e34773aa9a",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D172",
      "target": "figure-c08-d172",
      "title": "Craft modules · useful choices and real trade-offs",
      "file": "images/diagrams/c08-d172-module-choices.svg",
      "original": "images/diagrams/c08-d172-module-choices.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-CRAFT-03",
        "C08-CRAFT-05",
        "C08-CRAFT-09",
        "C08-CRAFT-11",
        "C08-CRAFT-16",
        "C08-CRAFT-18"
      ],
      "source_ids": [
        "REF06",
        "REF07",
        "HUL04",
        "HUL05",
        "HUL06"
      ],
      "caption": "Six distinct module responsibilities make configuration choices reviewable. The actual family reference supplies the physical concept; these relationships preserve capacity, fit and transport qualifications.",
      "alt": "Six module responsibility cards compare occupied access, cargo, living, instruments, services and conditional deployment, then connect them to whole-configuration alternatives.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "c2d9c292bd07a61bf8bda8c2256573cebf63f0f627ff06b168a657c4c7308db2",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    },
    {
      "id": "C08-D173",
      "target": "figure-c08-d173",
      "title": "Europa pressure lock · access, isolation and restoration",
      "file": "images/diagrams/c08-d173-pressure-transfer.svg",
      "original": "images/diagrams/c08-d173-pressure-transfer.svg",
      "kind": "Edition 08 editable reference",
      "origin": "editable_diagram",
      "section_ids": [
        "C08-EUR-06",
        "C08-EQ-32",
        "C08-EQ-38"
      ],
      "source_ids": [
        "SPX03",
        "DST04",
        "SUP03"
      ],
      "caption": "Distinct access and isolated states make the intended pressure-lock relationship explicit beside the component and installation cutaways. Exact enclosure geometry, transitions, timing and validation remain future implementation requirements.",
      "alt": "Four phases show dry access with wet boundary closed, both closed during transition, controlled wet-side access, and both closed during restoration.",
      "panels": [],
      "spoiler": false,
      "status": "Maintainer-authored explanatory reference; creative recommendation, not runtime or engineering proof.",
      "not_established": [
        "Final coordinates, clearances or block counts",
        "Selected recipes, rates, capacity or balance",
        "Implemented behavior or completed game tests"
      ],
      "sha256_file": "8c51c7603dde7f300c21177e31136b3a91db8d1358c7290eb96f091637f50638",
      "source_record": "sources/diagrams_08.json",
      "review_status": "Awaiting final rendered-sheet review"
    }
  ]
}
