{
  "edition": "complete-reference-08",
  "status": "Maintainer-authored comparisons of documented relationships; no numeric balancing or implementation acceptance.",
  "records": [
    {
      "id": "C08-COMP-01",
      "title": "Compact, regional and frontier workshops",
      "purpose": "Choose the amount and location of work that earns its space.",
      "columns": ["Choice", "Useful outcome", "Real obligations", "Supported alternative"],
      "rows": [
        ["Compact", "Maintain ordinary tools, make selected parts and prepare a chosen expedition.", "Actual stock, selected work positions, eligible service and a real returned-item/output position.", "Manual or shared-host methods remain worthwhile for modest jobs."],
        ["Regional", "Repeat known orders with justified preparation, handling and storage.", "Receiving and byproduct space, typed connections, isolation, protected walkways and accountable queues.", "Prepared feed and a shorter selected process can avoid unnecessary installations."],
        ["Frontier", "Keep field equipment operable, preserve evidence and improve a stated local duty.", "Imported first support, protected return stock, reachable service faces and destination-specific equipment.", "A small supplied refuge and limited service bay can remain the chosen scale."]
      ],
      "qualification": "C08-IND-05–C08-IND-10 and the configuration register explain the exact responsibilities. Larger scale is a choice, not a mandatory all-66-machine gate."
    },
    {
      "id": "C08-COMP-02",
      "title": "Main route, optional branches and the proposed continuation",
      "purpose": "Separate destination value from compulsory progression.",
      "columns": ["Route", "What it contributes", "What must remain possible"],
      "rows": [
        ["Earth → Moon → Mars → Europa → Titan → Pluto", "The principal creative Solar journey: home, vacuum, regional expedition, living ice-ocean, weather and distant observation.", "A complete supplied preparation route without mandatory Ceres/Io material tolls."],
        ["Ceres", "Anchoring, cargo route work and specific handling/material improvements.", "Skip the campaign and retain a supported principal-route preparation chain."],
        ["Io", "Observed thermal work, receiver-first commissioning and bounded withdrawal.", "Use a viable earlier thermal or material method where the main route requires it."],
        ["Cairn → Morrow, proposed", "A bounded Afterlight continuation after a satisfying Solar conclusion.", "Conclude at Pluto; prepare first survival and independent return before either new local discovery."]
      ],
      "qualification": "Capability families and confirmed concept tier numbers are separate classifications. No row proves a craft's range or transport fit."
    },
    {
      "id": "C08-COMP-03",
      "title": "Four essential services that must stay distinct",
      "purpose": "Make custody and compatibility visible before a workshop or expedition transfer begins.",
      "columns": ["Service", "Actual source and receiver", "A misleading shortcut to reject", "Useful blocked reason"],
      "rows": [
        ["Propellant or transit supply", "Supported prepared stock assigned to the actual vehicle/route duty.", "Treating an oxygen cylinder or a power bank as universal travel fuel.", "Wrong service type; return allocation protected; receiver full."],
        ["Breathing supply", "Compatible prepared breathing stock in its real tank, suit or refuge allocation.", "Counting nearby water, power or a decorative plant as supplied breathing support.", "Breathing connection unavailable; incompatible receiver; protected reserve unavailable to this order."],
        ["Electrical energy", "A supported source or charged store feeding a compatible work receiver.", "A control cable creating power, or an exhausted bank serving a second task.", "Source absent; remaining charge insufficient; destination capacity full."],
        ["Water and process fluid", "A declared liquid and method-specific receiver, with separate outputs where needed.", "Every blue pipe being interchangeable or a byproduct disappearing because no tank was provided.", "Required output has no receiver; wrong liquid; isolated circuit."]
      ],
      "qualification": "These are documentation contracts. Recipes, capacities, rates, efficiency and final connection geometry remain unverified."
    },
    {
      "id": "C08-COMP-04",
      "title": "Evidence, specimens, production stock and displayed objects",
      "purpose": "Preserve discoveries without creating duplicate materials.",
      "columns": ["Thing", "What persists", "What a later action does"],
      "rows": [
        ["Observation or surveyed route", "The recorded information, origin and qualification.", "Adds or revises knowledge; consuming a physical sample does not erase the observation."],
        ["Retained specimen", "The actual specimen in one identified holder.", "Moves it to another holder or deliberately allocates a portion; knowledge does not refill it."],
        ["Production portion", "The finite stock reserved or committed to a selected process.", "Consumes the declared material and produces the stated result once."],
        ["Display or collection", "The same physical object where display uses an actual item, or an explicitly documented record where it is only information.", "Moving a displayed item does not leave another usable copy behind."]
      ],
      "qualification": "C08-ATLAS-03, C08-IND-04 and the living sample contracts preserve the difference through interruption and managed absence."
    },
    {
      "id": "C08-COMP-05",
      "title": "What changes when an order stops?",
      "purpose": "Give different interruptions different, understandable recovery actions.",
      "columns": ["State", "Material and object state", "Supported next action"],
      "rows": [
        ["Cancelled before commitment", "Unconsumed reserved stock and the same object remain available.", "Release the reservation and return the original holder/object state."],
        ["Paused after partial work", "Track actual consumed input and in-process material; keep current identity.", "Restore the eligible service or use a specifically supported recovery method."],
        ["Output held", "The defined result remains in its actual process/holding location.", "Provide or clear the compatible receiver, then transfer once."],
        ["Service required", "The affected duty is isolated; unrelated real reserves remain protected.", "Diagnose and service the named part from its accessible face."],
        ["Inactive parked", "Managed stock, work and local state remain coherent.", "Resume supported activity when eligible participants return; no catch-up production or absence debt."]
      ],
      "qualification": "These states require future transaction, save/reload and ownership tests in the actual game representation."
    },
    {
      "id": "C08-COMP-06",
      "title": "First Playable and the wider Old Valley",
      "purpose": "Keep the first useful build boundary small while preserving the whole settlement vision.",
      "columns": ["Scope", "Included outcome", "Later connected work"],
      "rows": [
        ["Narrow opening proposal", "Essential guesthouse, old crossing, quarry, one Copperwash Channel strip and a limited workshop service.", "A real cargo and ordinary material-to-improvement loop proves the opening."],
        ["Wider five-stage Old Valley", "A working settlement, full mill/workshop relationships and the first market.", "Residents, finite goods, ordinary food/cultivation and useful construction extend everyday life."],
        ["Broader Earth and space direction", "35 creative Earth experiences, later workshops and the first supplied expedition.", "Add distinct complete journeys after the needed foundations; they are not prerequisites for finishing the narrow opening."]
      ],
      "qualification": "Smelt remains unbuilt at the recorded game authority. This creative comparison does not rewrite the game's accepted sequence."
    },
    {
      "id": "C08-COMP-07",
      "title": "Concept identity, capability family and tested configuration",
      "purpose": "Avoid deriving engineering promises from a rocket label or attractive view.",
      "columns": ["Record", "What it establishes", "What remains a separate question"],
      "rows": [
        ["Tier 1 Explorer and REF03", "The recognized early white/orange family and its complete intended first expedition.", "Compact cabin/suit/camera/cargo fit, final dimensions and actual transport representation."],
        ["REF06 and REF07", "The supplied later Tier 2 and Tier 3 appearance associations and confirmed silhouettes/palettes.", "Exact destination capability, measured interior layout, seating, carrier or separation behavior."],
        ["HUL01–HUL06", "Six broader creative mission/capability families with their own components and operational duties.", "A numeric one-to-one tier mapping or automatic acceptance of every configuration."],
        ["Future tested configuration", "The exact representation, service package, payload and route demonstrated by its evidence.", "Other loads, cabins, routes, platforms or later revisions that were not exercised."]
      ],
      "qualification": "C08-CRAFT-01 onward and C08-BUILD-06 preserve these distinctions. Concept artwork is not a measured fit test."
    },
    {
      "id": "C08-COMP-08",
      "title": "Creative Earth, implemented guide and historical column",
      "purpose": "Keep three legitimate source descriptions from becoming a false implementation claim.",
      "columns": ["Source description", "Meaning", "How to use it"],
      "rows": [
        ["Seven realms / 35 named experiences", "The creative Earth atlas and its full intended environmental relationships.", "Use for design, illustration, regional generation rules and future build planning."],
        ["672 levels / 15 implemented depth biomes", "The current guide relationship at game authority a0a702c2b5788d099645ab55ad23d8a5bf45c137.", "Use only with that implementation/evidence qualification; inspect accepted later game changes before advancing it."],
        ["Historical 512-level column", "An earlier preserved design statement.", "Retain as history and trace its reconciliation; do not present it as the current working column."]
      ],
      "qualification": "An environment image can be a style authority without proving that a creative experience is a registered, generated biome."
    },
    {
      "id": "C08-COMP-09",
      "title": "Mars applications improve a supported first arrival",
      "purpose": "Show how local discoveries add value without circular survival gates.",
      "columns": ["Application", "Specific later improvement", "Earlier supported mode", "Unverified claim to avoid"],
      "rows": [
        ["PM03 Ferric Lattice", "A replaceable external Survey Rover rack member.", "The supplied earlier frame remains usable for the first expedition.", "Free cargo capacity, universal chassis replacement or proven carrier fit."],
        ["PM04 Brine Catalyst", "Finite active charge in a reusable compatible processing housing.", "An ordinary supplied method remains valid before local production.", "Cleaning regenerates consumed contents, or an empty housing is a new charge."],
        ["Frontier Yard growth", "Chosen refuge, vehicle service, weather, materials, greenhouse or depot duties.", "A small supplied refuge/service arrangement can remain the preferred scale.", "Every stage is mandatory before useful exploration."],
        ["CEC01 option", "A separately documented possible ecological addition.", "The full geological campaign, Rootstone evidence and conclusion work without it.", "Existing canon or a required clue, resource or survival system."]
      ],
      "qualification": "The existing Mars campaign remains the detailed source; this comparison preserves its qualifications."
    },
    {
      "id": "C08-COMP-10",
      "title": "Reference completion and the next kinds of work",
      "purpose": "Distinguish complete documentation from implementation and public incorporation.",
      "columns": ["Responsibility", "Deliverable", "Acceptance evidence"],
      "rows": [
        ["Creative-reference maintainer", "Complete canonical text, reviewed concepts, editable explanations, reader, structured records and history.", "Preservation, source/asset/link checks, substantive review and fresh reader verification at the named revision."],
        ["Future game BUILD", "A selected bounded playable outcome in the actual mod.", "Code/asset inspection, native tests and complete player-task evidence."],
        ["Game-ready asset production", "Measured models, meshes, collision, UVs, texture atlases, animation and native media.", "Actual asset fit, performance and in-game presentation checks."],
        ["Technical validation", "Resolved recipes, rates, fit, generation and platform questions.", "Recorded measurements and play/seed/custody tests for the exact configuration."],
        ["Website agent", "Manual incorporation of the pinned source into public Reference, Worlds, Systems and truthful roadmap explanations.", "Its own tested, deployed and report revisions, preserving failures and execution limits."]
      ],
      "qualification": "The current programme authorizes the first responsibility and its repository handoff. It does not authorize the other production work by implication."
    }
  ]
}
