{
  "edition": "complete-reference-08",
  "id": "C08-INDUSTRY-BUILD-BOUNDS-OVERLAY",
  "date": "2026-10-09",
  "purpose": "Add an explicit bounded_scope for the 14 established industry/equipment/spacecraft future units using their existing outcomes, required decisions, acceptance and technical evidence. Original briefs remain unchanged.",
  "source_sha256": "c765ac1385a2c4ebdd7c40643410bb2ad9d52b2d07eca0f4d3cde5572fdaf5a2",
  "source_file": "sources/build_briefs_industry_08.json",
  "record_count": 14,
  "records": [
    {
      "id": "C08-BLD-IND-01",
      "title": "Typed service and finite custody contract",
      "bounded_scope": [
        "Bound one selected transfer to compatible service categories, identified containers, actual material and an authorized owner and receiver.",
        "Carry that transfer through commitment, partial refill, disconnection and held-output or recovery states while accounting for delivered and remaining stock once.",
        "Cover wrong-type and full-receiver blocking and protect real mission or refuge allocations from unauthorized repeat orders."
      ],
      "source_record": "sources/build_briefs_industry_08.json",
      "source_record_id": "C08-BLD-IND-01",
      "section_ids": [
        "C08-IND-03",
        "C08-IND-04",
        "C08-IND-13"
      ],
      "section_links": [
        {
          "file": "industry_connections_08.txt",
          "section_id": "C08-IND-03",
          "title": "A shared language for typed connections"
        },
        {
          "file": "industry_connections_08.txt",
          "section_id": "C08-IND-04",
          "title": "Custody, reservations and useful stopping points"
        },
        {
          "file": "industry_connections_08.txt",
          "section_id": "C08-IND-13",
          "title": "Water, propellant and breathing service remain distinct"
        }
      ],
      "scope_derivation": [
        {
          "scope_index": 0,
          "existing_source_fields": [
            "player_outcome",
            "required_decisions[0]"
          ]
        },
        {
          "scope_index": 1,
          "existing_source_fields": [
            "required_decisions[1]",
            "acceptance_outcomes[1]",
            "technical_evidence_required[2]"
          ]
        },
        {
          "scope_index": 2,
          "existing_source_fields": [
            "acceptance_outcomes[0]",
            "acceptance_outcomes[2]",
            "technical_evidence_required[3]"
          ]
        }
      ],
      "rationale": "Makes the existing selected transfer, custody stages and blocking cases explicit as one bounded foundation, without requiring a universal service framework.",
      "status": "Additive future-unit scope clarification for root review; no source-canon, numerical or authorization change."
    },
    {
      "id": "C08-BLD-IND-02",
      "title": "Useful compact electrical order",
      "bounded_scope": [
        "Complete one earlier-accessible electrical path that charges an actual field cell and lets a supported device use that cell after removal.",
        "Select the direct or buffered arrangement for that duty and distinguish source supply, stored energy and delivery limits.",
        "Include source interruption and inactive-region persistence, retaining actual bank and cell amounts without passive completion."
      ],
      "source_record": "sources/build_briefs_industry_08.json",
      "source_record_id": "C08-BLD-IND-02",
      "section_ids": [
        "C08-IND-06",
        "C08-IND-12",
        "C08-EQ-23"
      ],
      "section_links": [
        {
          "file": "industry_connections_08.txt",
          "section_id": "C08-IND-06",
          "title": "The compact powered and first-flight workshop"
        },
        {
          "file": "industry_connections_08.txt",
          "section_id": "C08-IND-12",
          "title": "Power choices and the complete energy relationship"
        },
        {
          "file": "equipment_field_service_08.txt",
          "section_id": "C08-EQ-23",
          "title": "EQ19 Field battery"
        }
      ],
      "scope_derivation": [
        {
          "scope_index": 0,
          "existing_source_fields": [
            "player_outcome",
            "required_decisions[0]",
            "technical_evidence_required[2]"
          ]
        },
        {
          "scope_index": 1,
          "existing_source_fields": [
            "required_decisions[1]",
            "acceptance_outcomes[1]"
          ]
        },
        {
          "scope_index": 2,
          "existing_source_fields": [
            "acceptance_outcomes[2]",
            "technical_evidence_required[3]"
          ]
        }
      ],
      "rationale": "Uses the existing complete source-to-cell-to-device outcome and interruption contract to define a useful compact order, not an entire power catalogue.",
      "status": "Additive future-unit scope clarification for root review; no source-canon, numerical or authorization change."
    },
    {
      "id": "C08-BLD-IND-03",
      "title": "Mechanical repair and protection host",
      "bounded_scope": [
        "Complete one ordinary tool repair or selected protection-component fitting through a modest workshop using compatible ordinary stock and a selected replacement.",
        "Preserve the same item, its personalization and contents; if the replacement is missing, return the original unchanged.",
        "Bound the work by its irreversible stage, returned-part receiver and shared work-position occupancy, including interruption, cancellation and a full receiver."
      ],
      "source_record": "sources/build_briefs_industry_08.json",
      "source_record_id": "C08-BLD-IND-03",
      "section_ids": [
        "C08-IND-05",
        "C08-IND-09",
        "C08-EQ-03"
      ],
      "section_links": [
        {
          "file": "industry_connections_08.txt",
          "section_id": "C08-IND-05",
          "title": "The mechanical repair court"
        },
        {
          "file": "industry_connections_08.txt",
          "section_id": "C08-IND-09",
          "title": "Textiles, panels and a living supply house"
        },
        {
          "file": "equipment_field_service_08.txt",
          "section_id": "C08-EQ-03",
          "title": "Service preserves the item and explains the cost"
        }
      ],
      "scope_derivation": [
        {
          "scope_index": 0,
          "existing_source_fields": [
            "player_outcome",
            "required_decisions[0]"
          ]
        },
        {
          "scope_index": 1,
          "existing_source_fields": [
            "acceptance_outcomes[0]",
            "acceptance_outcomes[1]"
          ]
        },
        {
          "scope_index": 2,
          "existing_source_fields": [
            "required_decisions[0]",
            "required_decisions[1]",
            "acceptance_outcomes[2]",
            "technical_evidence_required[2]",
            "technical_evidence_required[3]"
          ]
        }
      ],
      "rationale": "Retains the source alternative of repairing one tool or fitting one protection component and its same-item and receiver safeguards.",
      "status": "Additive future-unit scope clarification for root review; no source-canon, numerical or authorization change."
    },
    {
      "id": "C08-BLD-IND-04",
      "title": "Selected regional material chain",
      "bounded_scope": [
        "Complete one selected compatible feed-to-usable-product order and compare the whole regional route with its compact alternative.",
        "Account for the selected water quality, all output fractions, residue receivers and connected material, energy, service and cargo duties.",
        "Include a retained-stock stop and resume when mandatory residue cannot be received, and prevent repacking or reclamation from repeating extraction benefits."
      ],
      "source_record": "sources/build_briefs_industry_08.json",
      "source_record_id": "C08-BLD-IND-04",
      "section_ids": [
        "C08-IND-07",
        "C08-IND-08",
        "C08-IND-17"
      ],
      "section_links": [
        {
          "file": "industry_connections_08.txt",
          "section_id": "C08-IND-07",
          "title": "The regional metalworks and its compact alternatives"
        },
        {
          "file": "industry_connections_08.txt",
          "section_id": "C08-IND-08",
          "title": "Lightweight stock and selected chemical work"
        },
        {
          "file": "industry_connections_08.txt",
          "section_id": "C08-IND-17",
          "title": "Reclamation is a branch with limits"
        }
      ],
      "scope_derivation": [
        {
          "scope_index": 0,
          "existing_source_fields": [
            "player_outcome",
            "required_decisions[0]",
            "acceptance_outcomes[0]",
            "technical_evidence_required[3]"
          ]
        },
        {
          "scope_index": 1,
          "existing_source_fields": [
            "required_decisions[0]",
            "required_decisions[1]",
            "technical_evidence_required[0]",
            "technical_evidence_required[1]"
          ]
        },
        {
          "scope_index": 2,
          "existing_source_fields": [
            "acceptance_outcomes[1]",
            "acceptance_outcomes[2]",
            "technical_evidence_required[2]"
          ]
        }
      ],
      "rationale": "Bounds the unit to one usable product order and its whole-route comparison, using the source material, residue and reclamation obligations.",
      "status": "Additive future-unit scope clarification for root review; no source-canon, numerical or authorization change."
    },
    {
      "id": "C08-BLD-IND-05",
      "title": "Orders, construction and receiving freight",
      "bounded_scope": [
        "Supply one selected project stage or dispatched shipment through an identified authorized physical store and receiving point.",
        "Track reservation, committed stage and dispatch, transit and receipt custody under the established active-region rule.",
        "Cover interruption and a full receiver without duplicating stock or output, relocating retained freight, or starting production at an absent source."
      ],
      "source_record": "sources/build_briefs_industry_08.json",
      "source_record_id": "C08-BLD-IND-05",
      "section_ids": [
        "C08-IND-14",
        "C08-IND-15",
        "C08-IND-16"
      ],
      "section_links": [
        {
          "file": "industry_connections_08.txt",
          "section_id": "C08-IND-14",
          "title": "Components become construction without disappearing into a controller"
        },
        {
          "file": "industry_connections_08.txt",
          "section_id": "C08-IND-15",
          "title": "Controls explain and coordinate actual work"
        },
        {
          "file": "industry_connections_08.txt",
          "section_id": "C08-IND-16",
          "title": "Handling, freight and the return of containers"
        }
      ],
      "scope_derivation": [
        {
          "scope_index": 0,
          "existing_source_fields": [
            "player_outcome",
            "required_decisions[0]"
          ]
        },
        {
          "scope_index": 1,
          "existing_source_fields": [
            "required_decisions[1]",
            "acceptance_outcomes[0]",
            "acceptance_outcomes[3]",
            "technical_evidence_required[0]"
          ]
        },
        {
          "scope_index": 2,
          "existing_source_fields": [
            "acceptance_outcomes[0]",
            "acceptance_outcomes[1]",
            "acceptance_outcomes[2]",
            "technical_evidence_required[3]"
          ]
        }
      ],
      "rationale": "Preserves the source project-or-shipment choice and specifies the same finite custody stages already required for acceptance.",
      "status": "Additive future-unit scope clarification for root review; no source-canon, numerical or authorization change."
    },
    {
      "id": "C08-BLD-IND-06",
      "title": "Complete equipment interactions",
      "bounded_scope": [
        "Select a bounded subset of the existing EQ01–32 cards and complete each selected item’s distinct held, worn or deployed action and simultaneous fit with its carried load.",
        "Include the selected items’ target exclusions, relevant service limits and recoverable fault or stop rather than a shared gear-score substitute.",
        "Apply the appropriate existing interaction guard for the selected item, including powered-digging exclusions, occupied-crossing protection or separate sample knowledge and material custody."
      ],
      "source_record": "sources/build_briefs_industry_08.json",
      "source_record_id": "C08-BLD-IND-06",
      "section_ids": [
        "C08-EQ-05",
        "C08-EQ-08",
        "C08-EQ-10",
        "C08-EQ-13",
        "C08-EQ-20",
        "C08-EQ-31"
      ],
      "section_links": [
        {
          "file": "equipment_field_service_08.txt",
          "section_id": "C08-EQ-05",
          "title": "EQ01 Expedition pickaxe"
        },
        {
          "file": "equipment_field_service_08.txt",
          "section_id": "C08-EQ-08",
          "title": "EQ04 Powered hand drill"
        },
        {
          "file": "equipment_field_service_08.txt",
          "section_id": "C08-EQ-10",
          "title": "EQ06 Rope and anchor kit"
        },
        {
          "file": "equipment_field_service_08.txt",
          "section_id": "C08-EQ-13",
          "title": "EQ09 Deployable crossing kit"
        },
        {
          "file": "equipment_field_service_08.txt",
          "section_id": "C08-EQ-20",
          "title": "EQ16 Sample kit"
        },
        {
          "file": "equipment_field_service_08.txt",
          "section_id": "C08-EQ-31",
          "title": "EQ27 Repair and patch kit"
        }
      ],
      "scope_derivation": [
        {
          "scope_index": 0,
          "existing_source_fields": [
            "player_outcome",
            "required_decisions[0]",
            "technical_evidence_required[0]",
            "technical_evidence_required[1]"
          ]
        },
        {
          "scope_index": 1,
          "existing_source_fields": [
            "required_decisions[1]",
            "acceptance_outcomes[0]",
            "technical_evidence_required[2]",
            "technical_evidence_required[3]"
          ]
        },
        {
          "scope_index": 2,
          "existing_source_fields": [
            "acceptance_outcomes[1]",
            "acceptance_outcomes[2]",
            "acceptance_outcomes[3]"
          ]
        }
      ],
      "rationale": "Keeps selection to a bounded equipment subset and applies source guards only where relevant, rather than requiring all equipment in one unit.",
      "status": "Additive future-unit scope clarification for root review; no source-canon, numerical or authorization change."
    },
    {
      "id": "C08-BLD-IND-07",
      "title": "Explorer compact-first fit and starter manifest",
      "bounded_scope": [
        "Study the retained compact-first Explorer candidate using the coordinated player, suit, cabin boundaries, controls, boarding approach, service access, hatch movement and cargo together.",
        "Include the selected packed first-lunar manifest, Earth-made starter refuge and independent return supplies in that same fit study.",
        "Keep REF10 component fabrication distinct from REF09 and the full assembly berth, and report any measured conflict before selecting a revision of the candidate."
      ],
      "source_record": "sources/build_briefs_industry_08.json",
      "source_record_id": "C08-BLD-IND-07",
      "section_ids": [
        "C08-CRAFT-07",
        "C08-CRAFT-04",
        "C08-CRAFT-06"
      ],
      "section_links": [
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-07",
          "title": "T1-V01 Explorer Rocket remains compact-first"
        },
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-04",
          "title": "Assembly is a visible sequence with one vehicle identity"
        },
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-06",
          "title": "Cargo, deployment and the independent return"
        }
      ],
      "scope_derivation": [
        {
          "scope_index": 0,
          "existing_source_fields": [
            "player_outcome",
            "required_decisions[0]",
            "acceptance_outcomes[0]",
            "technical_evidence_required[1]"
          ]
        },
        {
          "scope_index": 1,
          "existing_source_fields": [
            "required_decisions[1]",
            "acceptance_outcomes[1]",
            "technical_evidence_required[2]"
          ]
        },
        {
          "scope_index": 2,
          "existing_source_fields": [
            "required_decisions[2]",
            "acceptance_outcomes[2]",
            "technical_evidence_required[3]"
          ]
        }
      ],
      "rationale": "States the coordinated fit and manifest study already required by the brief; candidate dimensions, measured outcome and future authorization remain unchanged.",
      "status": "Additive future-unit scope clarification for root review; no source-canon, numerical or authorization change."
    },
    {
      "id": "C08-BLD-IND-08",
      "title": "First supplied lunar service and recovery",
      "bounded_scope": [
        "Complete one first lunar departure, supplied arrival, refuge commissioning, excursion and homecoming using previously available stock and the selected early service methods.",
        "Retain the independent cabin during starter-refuge construction and make the refuge usable before a committed descent, without requiring a prebuilt lunar external plant.",
        "Include wrong connections, partial service, a disabled craft, warning-to-retreat and saved construction or service interruptions while preserving stock and unique records without offline depletion or absence debt."
      ],
      "source_record": "sources/build_briefs_industry_08.json",
      "source_record_id": "C08-BLD-IND-08",
      "section_ids": [
        "C08-EQ-27",
        "C08-EQ-28",
        "C08-EQ-29",
        "C08-EQ-30",
        "C08-CRAFT-21"
      ],
      "section_links": [
        {
          "file": "equipment_field_service_08.txt",
          "section_id": "C08-EQ-27",
          "title": "EQ23 Sealed expedition suit"
        },
        {
          "file": "equipment_field_service_08.txt",
          "section_id": "C08-EQ-28",
          "title": "EQ24 Breathing supply"
        },
        {
          "file": "equipment_field_service_08.txt",
          "section_id": "C08-EQ-29",
          "title": "EQ25 Shelter kit"
        },
        {
          "file": "equipment_field_service_08.txt",
          "section_id": "C08-EQ-30",
          "title": "EQ26 Communications beacon"
        },
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-21",
          "title": "State and animation intentions from boarding to parking"
        }
      ],
      "scope_derivation": [
        {
          "scope_index": 0,
          "existing_source_fields": [
            "player_outcome",
            "required_decisions[0]",
            "required_decisions[1]",
            "technical_evidence_required[0]"
          ]
        },
        {
          "scope_index": 1,
          "existing_source_fields": [
            "required_decisions[2]",
            "acceptance_outcomes[0]",
            "acceptance_outcomes[1]"
          ]
        },
        {
          "scope_index": 2,
          "existing_source_fields": [
            "acceptance_outcomes[2]",
            "acceptance_outcomes[3]",
            "technical_evidence_required[1]",
            "technical_evidence_required[2]",
            "technical_evidence_required[3]"
          ]
        }
      ],
      "rationale": "Uses the existing complete supplied lunar loop, refuge timing and recoverable service failures; no local first-arrival production dependency is introduced.",
      "status": "Additive future-unit scope clarification for root review; no source-canon, numerical or authorization change."
    },
    {
      "id": "C08-BLD-IND-09",
      "title": "Mars carrier and rover deployment fit",
      "bounded_scope": [
        "Select one genuinely supported carrier for the first SUP01 deployment, with earlier frame and spares, actual handling equipment, independent refuge and return; do not derive carrier capability from REF06/REF07 appearance.",
        "Resolve either the assembled-rover bay or an explicit finite deployment package, including the full manifest, opening, restraint, support, turning, unloading and supported crew positions.",
        "Complete departure, deployment, first local use and return with recovery from disabled deployment; first service precedes PM03/PM04 and does not assume Explorer Mars reach or rover carriage."
      ],
      "source_record": "sources/build_briefs_industry_08.json",
      "source_record_id": "C08-BLD-IND-09",
      "section_ids": [
        "C08-CRAFT-06",
        "C08-CRAFT-15",
        "C08-CRAFT-16",
        "C08-EQ-38"
      ],
      "section_links": [
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-06",
          "title": "Cargo, deployment and the independent return"
        },
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-15",
          "title": "HUL04 Peregrine: separate travel from field work"
        },
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-16",
          "title": "Peregrine variants and the rover transport test"
        },
        {
          "file": "equipment_field_service_08.txt",
          "section_id": "C08-EQ-38",
          "title": "Lunar, Mars and later field service"
        }
      ],
      "scope_derivation": [
        {
          "scope_index": 0,
          "existing_source_fields": [
            "player_outcome",
            "required_decisions[0]",
            "required_decisions[2]"
          ]
        },
        {
          "scope_index": 1,
          "existing_source_fields": [
            "required_decisions[1]",
            "acceptance_outcomes[0]",
            "acceptance_outcomes[1]",
            "technical_evidence_required[0]",
            "technical_evidence_required[1]"
          ]
        },
        {
          "scope_index": 2,
          "existing_source_fields": [
            "acceptance_outcomes[2]",
            "acceptance_outcomes[3]",
            "technical_evidence_required[2]",
            "technical_evidence_required[3]"
          ]
        }
      ],
      "rationale": "Carries forward the existing carrier-method choice and complete deployment duty while retaining unverified fit and the explicit Explorer and post-arrival-material boundaries.",
      "status": "Additive future-unit scope clarification for root review; no source-canon, numerical or authorization change."
    },
    {
      "id": "C08-BLD-IND-10",
      "title": "Post-arrival material improvement",
      "bounded_scope": [
        "Choose one PM03 or PM04 application that improves an existing vehicle or service duty after first access, while preserving its supported conventional earlier service.",
        "Connect its accepted sample, selected processing method and ordinary companion inputs to explicit preserved, research and production allocations and the chosen manufactured-member or finite-cartridge benefit.",
        "Track the applicable physical change: manufacture PM03 geometry and replace the actual member once, or separate PM04 spent stock from its reusable housing; include full or spent receivers and interruption."
      ],
      "source_record": "sources/build_briefs_industry_08.json",
      "source_record_id": "C08-BLD-IND-10",
      "section_ids": [
        "C08-IND-10",
        "C08-EQ-20",
        "C08-CRAFT-16"
      ],
      "section_links": [
        {
          "file": "industry_connections_08.txt",
          "section_id": "C08-IND-10",
          "title": "A sample-led lunar or frontier workshop"
        },
        {
          "file": "equipment_field_service_08.txt",
          "section_id": "C08-EQ-20",
          "title": "EQ16 Sample kit"
        },
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-16",
          "title": "Peregrine variants and the rover transport test"
        }
      ],
      "scope_derivation": [
        {
          "scope_index": 0,
          "existing_source_fields": [
            "player_outcome",
            "acceptance_outcomes[3]"
          ]
        },
        {
          "scope_index": 1,
          "existing_source_fields": [
            "required_decisions[0]",
            "required_decisions[1]",
            "required_decisions[2]",
            "technical_evidence_required[0]"
          ]
        },
        {
          "scope_index": 2,
          "existing_source_fields": [
            "acceptance_outcomes[0]",
            "acceptance_outcomes[1]",
            "acceptance_outcomes[2]",
            "technical_evidence_required[1]",
            "technical_evidence_required[3]"
          ]
        }
      ],
      "rationale": "Keeps PM03 and PM04 as alternative selected improvements to an already possible duty, preserving the source allocation and physical replacement distinctions.",
      "status": "Additive future-unit scope clarification for root review; no source-canon, numerical or authorization change."
    },
    {
      "id": "C08-BLD-IND-11",
      "title": "Later supplied rocket reference decisions",
      "bounded_scope": [
        "Prepare a coordinated component, interior and state candidate for each supplied REF06/REF07 family while preserving its dominant silhouette and palette.",
        "State the selected functions of service or lateral bodies and align occupied entrances and glazing with the exterior, retaining a component and connection decision record.",
        "Keep capability and destination mapping explicit, leave movement or separation absent unless independently selected, and retain an open measurement and mission-dependency list rather than deriving crew, cargo or range numbers from artwork."
      ],
      "source_record": "sources/build_briefs_industry_08.json",
      "source_record_id": "C08-BLD-IND-11",
      "section_ids": [
        "C08-CRAFT-08",
        "C08-CRAFT-09",
        "C08-CRAFT-10",
        "C08-CRAFT-11"
      ],
      "section_links": [
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-08",
          "title": "REF06 Concept 2: the later Tier 2 appearance"
        },
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-09",
          "title": "Concept 2: assembly, cabin and state intentions"
        },
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-10",
          "title": "REF07 Concept 3 Deep-Space Rocket: a distinct advanced family"
        },
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-11",
          "title": "Concept 3: a complete service and use reference"
        }
      ],
      "scope_derivation": [
        {
          "scope_index": 0,
          "existing_source_fields": [
            "player_outcome",
            "acceptance_outcomes[0]",
            "technical_evidence_required[0]"
          ]
        },
        {
          "scope_index": 1,
          "existing_source_fields": [
            "required_decisions[0]",
            "acceptance_outcomes[1]",
            "technical_evidence_required[1]"
          ]
        },
        {
          "scope_index": 2,
          "existing_source_fields": [
            "required_decisions[1]",
            "required_decisions[2]",
            "acceptance_outcomes[2]",
            "acceptance_outcomes[3]",
            "technical_evidence_required[2]",
            "technical_evidence_required[3]"
          ]
        }
      ],
      "rationale": "Bounds independent later-tier reference decisions to the supplied identities and coordinated candidate relationships; capability, separation and later measurement remain separate decisions.",
      "status": "Additive future-unit scope clarification for root review; no source-canon, numerical or authorization change."
    },
    {
      "id": "C08-BLD-IND-12",
      "title": "Capability-class hull fit and complete use",
      "bounded_scope": [
        "Select one existing HUL01–06 role and configuration and coordinate its actual shell, occupied spaces, cargo and interfaces for a complete supported mission.",
        "Include boarding, cabin use, loading, travel, arrival, conventional service and independent return for the actual chosen passengers and cargo.",
        "Treat any selected variant, separation, docking or refit through its applicable complete use and recovery contract, retaining personalization and earlier hull usefulness rather than a compulsory hull-disposal chain or arbitrary moving voxel base."
      ],
      "source_record": "sources/build_briefs_industry_08.json",
      "source_record_id": "C08-BLD-IND-12",
      "section_ids": [
        "C08-CRAFT-12",
        "C08-CRAFT-13",
        "C08-CRAFT-14",
        "C08-CRAFT-15",
        "C08-CRAFT-17",
        "C08-CRAFT-19"
      ],
      "section_links": [
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-12",
          "title": "HUL01 Lark: the local work craft"
        },
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-13",
          "title": "HUL02 Keel: the authored orbital representative"
        },
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-14",
          "title": "HUL03 Pilgrim: a lander the player lives beside"
        },
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-15",
          "title": "HUL04 Peregrine: separate travel from field work"
        },
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-17",
          "title": "HUL05 Hearth: a traveling place with conventional support"
        },
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-19",
          "title": "HUL06 Far Lantern: a bounded interstellar achievement"
        }
      ],
      "scope_derivation": [
        {
          "scope_index": 0,
          "existing_source_fields": [
            "player_outcome",
            "required_decisions[0]",
            "technical_evidence_required[0]"
          ]
        },
        {
          "scope_index": 1,
          "existing_source_fields": [
            "required_decisions[1]",
            "acceptance_outcomes[0]",
            "acceptance_outcomes[2]",
            "technical_evidence_required[1]"
          ]
        },
        {
          "scope_index": 2,
          "existing_source_fields": [
            "required_decisions[2]",
            "acceptance_outcomes[1]",
            "acceptance_outcomes[3]",
            "technical_evidence_required[2]",
            "technical_evidence_required[3]"
          ]
        }
      ],
      "rationale": "Restricts work to one selected established hull role and a complete use configuration, retaining the source limits on variants, capacity assumptions and mandatory hull progression.",
      "status": "Additive future-unit scope clarification for root review; no source-canon, numerical or authorization change."
    },
    {
      "id": "C08-BLD-IND-13",
      "title": "Finite optional advanced plant",
      "bounded_scope": [
        "Choose one existing C06-AR fictional branch and complete its finite preparation, useful operation and spent-stock handling using selected earlier frame inputs and an explicit recipe.",
        "Account for startup, active operation, heat and recovery together with fresh, intermediate and spent custody; a full spent receiver stops new allocation.",
        "Include controlled interruption and parked persistence that retain the current cassette and contents without absent-player accident or cleanup debt, while keeping the optional power branch outside ordinary campaign prerequisites."
      ],
      "source_record": "sources/build_briefs_industry_08.json",
      "source_record_id": "C08-BLD-IND-13",
      "section_ids": [
        "C08-IND-18"
      ],
      "section_links": [
        {
          "file": "industry_connections_08.txt",
          "section_id": "C08-IND-18",
          "title": "Later research plants connect to the same economy"
        }
      ],
      "scope_derivation": [
        {
          "scope_index": 0,
          "existing_source_fields": [
            "player_outcome",
            "required_decisions[0]",
            "technical_evidence_required[0]"
          ]
        },
        {
          "scope_index": 1,
          "existing_source_fields": [
            "required_decisions[1]",
            "acceptance_outcomes[0]",
            "acceptance_outcomes[1]",
            "technical_evidence_required[1]",
            "technical_evidence_required[2]"
          ]
        },
        {
          "scope_index": 2,
          "existing_source_fields": [
            "required_decisions[2]",
            "acceptance_outcomes[2]",
            "acceptance_outcomes[3]",
            "technical_evidence_required[3]"
          ]
        }
      ],
      "rationale": "Turns the existing finite advanced-plant preparation, custody and stop requirements into a scope boundary without selecting recipes or making optional power compulsory.",
      "status": "Additive future-unit scope clarification for root review; no source-canon, numerical or authorization change."
    },
    {
      "id": "C08-BLD-IND-14",
      "title": "Pre-Afterlight transit and independent return",
      "bounded_scope": [
        "Select one complete Far Lantern voyage using retained earlier observations, a validated hull and route, conventional protection and actual pre-Afterlight services.",
        "Bound C06-AR05/06 preparation and transit to their selected role and supplies available before Cairn or Morrow, including an independent return without destination-derived propellant or material.",
        "Keep knowledge records distinct from physical samples and preserve unused stock and observations through cancellation and fault or refuge recovery; PM15–18 refits remain subsequent optional work."
      ],
      "source_record": "sources/build_briefs_industry_08.json",
      "source_record_id": "C08-BLD-IND-14",
      "section_ids": [
        "C08-IND-18",
        "C08-CRAFT-19",
        "C08-CRAFT-22"
      ],
      "section_links": [
        {
          "file": "industry_connections_08.txt",
          "section_id": "C08-IND-18",
          "title": "Later research plants connect to the same economy"
        },
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-19",
          "title": "HUL06 Far Lantern: a bounded interstellar achievement"
        },
        {
          "file": "spacecraft_completion_08.txt",
          "section_id": "C08-CRAFT-22",
          "title": "Progression alternatives and the dependency boundary"
        }
      ],
      "scope_derivation": [
        {
          "scope_index": 0,
          "existing_source_fields": [
            "player_outcome",
            "required_decisions[1]",
            "technical_evidence_required[0]",
            "technical_evidence_required[1]"
          ]
        },
        {
          "scope_index": 1,
          "existing_source_fields": [
            "required_decisions[0]",
            "acceptance_outcomes[0]",
            "acceptance_outcomes[1]",
            "technical_evidence_required[2]"
          ]
        },
        {
          "scope_index": 2,
          "existing_source_fields": [
            "required_decisions[2]",
            "acceptance_outcomes[2]",
            "acceptance_outcomes[3]",
            "technical_evidence_required[3]"
          ]
        }
      ],
      "rationale": "Preserves the source pre-Afterlight outward-and-return obligation, independent earlier supplies and retained evidence without making later local refits prerequisites.",
      "status": "Additive future-unit scope clarification for root review; no source-canon, numerical or authorization change."
    }
  ],
  "authority_boundary": "This overlay neither authorizes a game BUILD or production asset nor selects a new feature, recipe, capacity, rate, mission capability or engineering result. Source dependencies, outcomes, acceptance, evidence, unresolved decisions and complete original records remain authoritative.",
  "normalization_recommendation": {
    "affected_source": "build_briefs_industry_08.json",
    "affected_ids": [
      "C08-BLD-IND-01",
      "C08-BLD-IND-02",
      "C08-BLD-IND-03",
      "C08-BLD-IND-04",
      "C08-BLD-IND-05",
      "C08-BLD-IND-06",
      "C08-BLD-IND-07",
      "C08-BLD-IND-08",
      "C08-BLD-IND-09",
      "C08-BLD-IND-10",
      "C08-BLD-IND-11",
      "C08-BLD-IND-12",
      "C08-BLD-IND-13",
      "C08-BLD-IND-14"
    ],
    "field": "scope",
    "mapping": "For these 14 source IDs, copy overlay.records[id].bounded_scope into normalized scope. Keep the original source record, dependency list, unresolved required_decisions and all other existing mappings unchanged.",
    "existing_mappings_to_retain": {
      "outcome": "player_outcome",
      "dependencies": "depends_on",
      "acceptance": "acceptance_outcomes",
      "evidence": "technical_evidence_required",
      "unresolved": "required_decisions",
      "section_ids": "section_links[].section_id"
    },
    "integration_owner": "root"
  },
  "bounded_field_audit": {
    "normalized_records_checked": 76,
    "fields": {
      "outcome": {
        "empty_count": 0,
        "affected_ids": []
      },
      "scope": {
        "empty_count": 14,
        "affected_ids": [
          "C08-BLD-IND-01",
          "C08-BLD-IND-02",
          "C08-BLD-IND-03",
          "C08-BLD-IND-04",
          "C08-BLD-IND-05",
          "C08-BLD-IND-06",
          "C08-BLD-IND-07",
          "C08-BLD-IND-08",
          "C08-BLD-IND-09",
          "C08-BLD-IND-10",
          "C08-BLD-IND-11",
          "C08-BLD-IND-12",
          "C08-BLD-IND-13",
          "C08-BLD-IND-14"
        ]
      },
      "acceptance": {
        "empty_count": 0,
        "affected_ids": []
      },
      "evidence": {
        "empty_count": 0,
        "affected_ids": []
      },
      "section_ids": {
        "empty_count": 0,
        "affected_ids": []
      }
    },
    "finding": "Only the 14 industry scope fields are empty. Their source schema does not contain bounded_scope or scope; this is a compatibility gap, not omitted existing scope prose. All other requested fields are populated."
  },
  "risk_field_review": {
    "records_with_source_schema_checked": 66,
    "mappings": [
      {
        "source": "build_briefs_industry_08.json",
        "source_field": "required_decisions",
        "normalized_field": "unresolved",
        "records": 14,
        "exact_matches": 14,
        "omitted_records": 0
      },
      {
        "source": "build_briefs_living_08.json",
        "source_field": "open_engineering_or_balance_questions",
        "normalized_field": "unresolved",
        "records": 19,
        "exact_matches": 19,
        "omitted_records": 0
      },
      {
        "source": "build_briefs_farther_08.json",
        "source_field": "unresolved_validation",
        "normalized_field": "unresolved",
        "records": 33,
        "exact_matches": 33,
        "omitted_records": 0
      }
    ],
    "shared_integration_records": 10,
    "shared_integration_unresolved_nonempty": true,
    "finding": "No explicit source risk/decision/question field was omitted from normalization. Industry required_decisions, living open_engineering_or_balance_questions and farther unresolved_validation are already copied exactly to unresolved. No separate risks field exists in these per-unit source schemas."
  },
  "verification": {
    "all14_exact_source_ids": true,
    "scope_statements_per_unit": 3,
    "all_statement_source_field_paths_resolve": true,
    "all_section_ids_found": true,
    "source_brief_sha256_unchanged_during_authoring": true,
    "shared_source_edits": 0,
    "new_numeric_or_feature_decisions": 0
  }
}
