{
  "edition": "selected-completion-06",
  "figures": [
    {
      "id": "C06-D12",
      "title": "Four support craft: mission and service comparison",
      "file": "images/diagrams/c06-d12-support-vehicle-services.svg",
      "caption": "Each support craft solves a different local route problem. First deployment uses earlier supplies; planetary materials improve later configurations. Service categories are semantic relationships, not final connectors or measured capacities.",
      "alt": "Four cards compare Survey Rover ground survey, Cargo Crawler prepared freight routes, Ice Submersible mapped water corridors and Atmospheric Survey Skiff supported weather volumes. Each lists separate energy, environment, cargo and data duties and a complete return to a prepared site.",
      "source_ids": [
        "SUP01",
        "SUP02",
        "SUP03",
        "SUP04",
        "PM03",
        "PM06",
        "PM07",
        "PM08",
        "PM11",
        "PM12",
        "CD05-E20"
      ],
      "package": "P12-A",
      "section_ids": [
        "C06-P12A-02",
        "C06-P12A-03",
        "C06-P12A-05",
        "C06-P12A-07",
        "C06-P12A-09"
      ],
      "status": "New editable explanatory SVG; proposed design relationships, not implemented behaviour.",
      "not_established": [
        "Exact geometry/connectors",
        "Crew/cargo capacity",
        "Travel physics/range",
        "Runtime validation"
      ]
    },
    {
      "id": "C06-D13",
      "title": "Orbital modules: occupied connections and separate services",
      "file": "images/diagrams/c06-d13-orbital-modules.svg",
      "caption": "A proposed compact station connects a captured vessel through an isolated transfer cell into the inhabited corridor. Rooms and a separately closable refuge branch from that corridor. Power and environmental lines are separate service paths; capped future branches remain isolated until commissioned. Transfer Yard can extend this topology at authored connection points.",
      "alt": "A captured vessel connects to a docking collar, two-boundary transfer cell in a pressure corridor and storage spine. Window room and emergency refuge branch above and below the inhabited corridor. Power and service modules connect by dashed service lines, not passages. A capped storage extension stays closed until commissioned.",
      "source_ids": [
        "STA01",
        "STA02",
        "STA03",
        "CD05-E20"
      ],
      "package": "P12-B",
      "section_ids": [
        "C06-P12B-02",
        "C06-P12B-03",
        "C06-P12B-04",
        "C06-P12B-06",
        "C06-P12B-07",
        "C06-P12B-08",
        "C06-P12B-13"
      ],
      "status": "New editable explanatory SVG; proposed adjacency/boundary logic, not final geometry.",
      "not_established": [
        "Numerical dimensions",
        "Final footprint",
        "Pressure simulation",
        "Dock tolerance",
        "Occupant capacity",
        "Runtime validation"
      ]
    }
  ]
}
